{"id":10639,"date":"2013-05-08T10:07:27","date_gmt":"2013-05-08T07:07:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10639"},"modified":"2013-05-08T10:07:27","modified_gmt":"2013-05-08T07:07:27","slug":"gunes-enerjisi-yatirim-basvurulari-10-14-haziran-tarihlerinde","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-enerjisi-yatirim-basvurulari-10-14-haziran-tarihlerinde\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Enerjisi Yat\u0131r\u0131m Ba\u015fvurular\u0131 10-14 Haziran Tarihlerinde&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10639\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015ften elektrik \u00fcretimi i\u00e7in 2,5 milyar lira tutar\u0131nda lisans ba\u015fvurular\u0131nda erteleme olmayacak. Yakla\u015f\u0131k yat\u0131r\u0131m tutar\u0131 2,5 milyar lira olan 600 MW\u2019l\u0131k g\u00fcne\u015f enerjisi yat\u0131r\u0131m ba\u015fvurular\u0131 konusunda Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) yerli ve yabanc\u0131 yat\u0131r\u0131mc\u0131lar taraf\u0131ndan merakla beklenen karar\u0131n\u0131 verdi.<\/strong><\/p>\n<p>EPDK \u00f6zel sekt\u00f6r ba\u015fvuru<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerji-si-yatirim-basvurulari.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10640\" title=\"gunes-enerji-si-yatirim-basvurulari\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerji-si-yatirim-basvurulari-300x189.jpg\" alt=\"\" width=\"300\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerji-si-yatirim-basvurulari-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerji-si-yatirim-basvurulari-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerji-si-yatirim-basvurulari.jpg 474w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>lar\u0131n\u0131 ertelemeyece\u011fini, 10-14 Haziran tarihleri aras\u0131nda alaca\u011f\u0131n\u0131 duyurdu.<\/p>\n<h2>G\u00fcne\u015f \u00f6l\u00e7\u00fcm \u015fart\u0131<\/h2>\n<p>Ge\u00e7ti\u011fimiz Mart ay\u0131nda yasala\u015fan 6446 Say\u0131l\u0131 elektrik Piyasas\u0131 Kanunu\u2019nda g\u00fcne\u015f enerjisi \u00fcretim lisans\u0131 ba\u015fvurusu yap\u0131lmas\u0131 \u00f6zel \u015firketlerin bir y\u0131l g\u00fcne\u015f \u00f6l\u00e7\u00fcm\u00fc yap\u0131lmas\u0131 \u015fart\u0131 getirilmi\u015fti.<\/p>\n<p>Bu durum sekt\u00f6rde \u201cyat\u0131r\u0131m ba\u015fvurular\u0131 ertelenecek mi?\u201d sorusunu do\u011furmu\u015ftu.<\/p>\n<p>Kurul kanun de\u011fi\u015fikli\u011finin ba\u015fvurular\u0131n\u0131n ertelenmesine gerek do\u011furmad\u0131\u011f\u0131na karar verdi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/05\/07\/gunese-25-milyarlik-yatirim-yolda\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015ften elektrik \u00fcretimi i\u00e7in 2,5 milyar lira tutar\u0131nda lisans ba\u015fvurular\u0131nda erteleme olmayacak. Yakla\u015f\u0131k yat\u0131r\u0131m tutar\u0131 2,5 milyar lira olan 600 MW\u2019l\u0131k g\u00fcne\u015f enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10640,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1046,750,227,13,5173,679,5172],"views":615,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10639"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10639"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10639\/revisions"}],"predecessor-version":[{"id":10642,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10639\/revisions\/10642"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10640"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10639"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}