{"id":106240,"date":"2020-01-11T15:06:29","date_gmt":"2020-01-11T12:06:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=106240"},"modified":"2020-01-11T15:06:29","modified_gmt":"2020-01-11T12:06:29","slug":"legrand-dan-5-5-milyon-euroluk-yeni-fabrika","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/legrand-dan-5-5-milyon-euroluk-yeni-fabrika\/","title":{"rendered":"(Turkish) Legrand\u2019dan 5.5 Milyon Euro\u2019luk Yeni Fabrika"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/106240\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Bina, elektrik ve dijital altyap\u0131lar i\u00e7in \u00fcr\u00fcn ve sistemler geli\u015ftiren Frans\u0131z devi Legrand Grup, T\u00fcrkiye\u2019deki yat\u0131r\u0131mlar\u0131na devam ediyor. Son d\u00f6nemdeki ekonomik dalgalanmalara ra\u011fmen yeni \u0130nform fabrikas\u0131n\u0131 5.5 milyon Euro\u2019luk bir b\u00fct\u00e7eyle hayata ge\u00e7iren Legrand, T\u00fcrkiye\u2019deki yat\u0131r\u0131m\u0131n\u0131 art\u0131rma hedefiyle i\u015f s\u00fcre\u00e7lerini y\u00f6netiyor.<\/strong><\/h1>\n<p><strong>Bina, elektrik ve dijital altyap\u0131lar i\u00e7in \u00fcr\u00fcn ve sistemler<\/strong> geli\u015ftiren, Legrand b\u00fcnyesinde yer alan \u0130nform\u2019un yeni fabrikas\u0131n\u0131 <strong>5.5 milyon Euro\u2019luk<\/strong> bir b\u00fct\u00e7eyle hayata ge\u00e7irdi.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-106242\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/legrand-dan-5-5-milyon-euroluk-yeni-fabrika-1.jpg\" alt=\"\" width=\"320\" height=\"399\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/legrand-dan-5-5-milyon-euroluk-yeni-fabrika-1.jpg 391w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/legrand-dan-5-5-milyon-euroluk-yeni-fabrika-1-240x300.jpg 240w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/legrand-dan-5-5-milyon-euroluk-yeni-fabrika-1-320x400.jpg 320w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/legrand-dan-5-5-milyon-euroluk-yeni-fabrika-1-40x50.jpg 40w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Son teknolojiyle donat\u0131lan<\/strong> ve <strong>28.000 m2\u2019si<\/strong> kapal\u0131 olmak \u00fczere toplam <strong>28.500 m2.lik<\/strong> bir alana konumlanan <strong>\u0130nform fabrikas\u0131, UPS sekt\u00f6r\u00fcnde<\/strong> t\u00fcm \u00fcretim s\u00fcre\u00e7lerini kendi b\u00fcnyesinde bulunduran tek firma \u00f6zelli\u011fiyle rakiplerinden ayr\u0131l\u0131yor. Sarg\u0131l\u0131 elemanlar, d\u0131\u015f etkenlerden izole edilmi\u015f elektronik kart dizgi tesisi, mekanik \u00fcretim at\u00f6lyesi ve montaj hatlar\u0131n\u0131n yan\u0131 s\u0131ra <strong>Ar-Ge ve M\u00fc\u015fteri Hizmetleri Merkezini<\/strong> b\u00fcnyesinde bar\u0131nd\u0131ran tesis, <strong>300 ki\u015filik alan\u0131nda<\/strong> uzman profesyonel bir ekiple y\u00f6netiliyor. Teknolojisinin yan\u0131 s\u0131ra <strong>End\u00fcstri 4.0 yakla\u015f\u0131m\u0131<\/strong> ile in\u015fa edilen yeni fabrika, \u00e7evre dostu ve enerji t\u00fcketimi d\u00fc\u015f\u00fck ekipmanlara ev sahipli\u011fi yap\u0131yor. <strong>Y\u00fcksek verimli trafo, LED ayd\u0131nlatmalar, hareket ve varl\u0131k sens\u00f6rleriyle<\/strong> s\u00fcrd\u00fcr\u00fclebilir d\u00fcnyaya katk\u0131 sa\u011flayan \u0130nform\u2019un yeni fabrikas\u0131, her bir <strong>da\u011f\u0131t\u0131m panosunda t\u00fcketimi<\/strong> izleyip aksiyon alabilen <strong>g\u00fc\u00e7 analiz\u00f6rleri<\/strong> ve <strong>g\u00fcn \u0131\u015f\u0131\u011f\u0131ndan yararlanmay\u0131<\/strong> sa\u011flayan \u00e7at\u0131 tasar\u0131m\u0131yla \u00f6ne \u00e7\u0131k\u0131yor.<\/p>\n<h2><strong>Xerri: Yat\u0131r\u0131m\u0131n ger\u00e7e\u011fe d\u00f6n\u00fc\u015fmesi bizim i\u00e7in heyecan verici <\/strong><\/h2>\n<p>Yeni fabrika yat\u0131r\u0131m\u0131yla ilgili a\u00e7\u0131klamada bulunan Le<strong>grand Grup Avrupa\u2019dan Sorumlu Ba\u015fkan Yard\u0131mc\u0131s\u0131 Frederic Xerri<\/strong>, A\u011fustos 2018\u2019de T\u00fcrk Liras\u0131\u2019nda ger\u00e7ekle\u015fen deval\u00fcasyon ile birlikte ekonominin darald\u0131\u011f\u0131n\u0131 ancak tam da ayn\u0131 d\u00f6nemde <strong>Legrand Grup<\/strong> olarak T\u00fcrkiye\u2019ye yeni yat\u0131r\u0131m karar\u0131 verdiklerini an\u0131msatt\u0131. Ekonomik dalgalanman\u0131n en yo\u011fun ya\u015fand\u0131\u011f\u0131 g\u00fcnlerde <strong>Legrand Grup<\/strong> CEO\u2019su <strong>Benoit Coquart<\/strong>\u2019\u0131n T\u00fcrkiye\u2019ye yapt\u0131\u011f\u0131 ziyarette <strong>5.5 Milyon Euro\u2019luk<\/strong> yat\u0131r\u0131m karar\u0131n\u0131 a\u00e7\u0131klad\u0131\u011f\u0131n\u0131 s\u00f6yleyen<strong> Frederic Xerri<\/strong>, bu yat\u0131r\u0131m\u0131n\u0131n bug\u00fcn ger\u00e7e\u011fe d\u00f6n\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc g\u00f6rmenin hakl\u0131 gururunu ya\u015fad\u0131klar\u0131n\u0131 s\u00f6yledi. <strong>Legrand Grup<\/strong>\u2019un \u00fcst d\u00fczey y\u00f6netiminin T\u00fcrkiye\u2019deki insan g\u00fcc\u00fcne, yarat\u0131c\u0131l\u0131\u011fa ve Grup\u2019a verdikleri deste\u011fe g\u00fcvendi\u011fini aktaran<strong> Xerri, <\/strong>T\u00fcrkiye\u2019nin grup i\u00e7in \u00f6nemli bir konumda oldu\u011funu belirtti.<\/p>\n<h2><strong>Xerri: T\u00fcrk insan\u0131na, T\u00fcrk i\u015f g\u00fcc\u00fcne inan\u0131yoruz<\/strong><\/h2>\n<p><strong>Yeni fabrika<\/strong> ile birlikte <strong>hem kapasite hem de kalite art\u0131\u015f\u0131<\/strong> sa\u011flad\u0131klar\u0131n\u0131 anlatan Xerri, \u201c<em>End\u00fcstri 4.0 \u00e7er\u00e7evesinde yap\u0131land\u0131rd\u0131\u011f\u0131m\u0131z \u00fcretim s\u00fcre\u00e7leri ile s\u00fcrd\u00fcrebilir kalite ve verimlilik elde edece\u011fimizi biliyoruz. Bu beklenen i\u015f sonu\u00e7lar\u0131n\u0131n da <strong>Legrand T\u00fcrkiye\u2019de<\/strong> daha fazla i\u015f imkan\u0131 getirece\u011fini \u00f6n g\u00f6r\u00fcyoruz.<\/em> Grubun 2018 y\u0131l\u0131 performans\u0131n\u0131 de\u011ferlendiren <strong>Xerri<\/strong><em>; \u201c2018 y\u0131l\u0131nda T\u00fcrkiye\u2019de \u00e7ok g\u00fczel performans sergiledik. Globalde % 8.6 oran\u0131nda b\u00fcy\u00fcyen Legrand, ayn\u0131 d\u00f6nemde T\u00fcrkiye\u2019de % 40 b\u00fcy\u00fcd\u00fc. 2019\u2019da ise T\u00fcrkiye\u2019de yine \u00e7ift haneli b\u00fcy\u00fcd\u00fck. 2022 hakk\u0131nda d\u00fcnyada ve T\u00fcrkiye\u2019de ya\u015fanan geli\u015fmeleri \u00f6n g\u00f6rerek yorum yapmam olduk\u00e7a zor fakat Legrand Grup olarak T\u00fcrk i\u015f g\u00fcc\u00fcne ve T\u00fcrkiye\u2019ye inan\u0131yoruz.\u201d <\/em><\/p>\n<p><strong>Legrand T\u00fcrkiye \u00dclke M\u00fcd\u00fcr\u00fc Levent Ilg\u0131n<\/strong> ise, son iki y\u0131lda fabrika baz\u0131nda T\u00fcrkiye\u2019de metrekarelerini \u00fc\u00e7e katlad\u0131klar\u0131n\u0131 s\u00f6yleyerek, \u201c<em>Makine park\u0131m\u0131z ise tamamen otomasyona ge\u00e7irerek \u00fcretim kapasitemizi ikiye katlad\u0131k<\/em>\u201d<\/p>\n<h2><strong>Xerri: Nesnelerin \u0130nternetinin cirodaki pay\u0131 art\u0131yor<\/strong><\/h2>\n<p><em>Bundan sonra <strong>nesnelerin interneti<\/strong> \u00fczerine yo\u011funla\u015facaklar\u0131n\u0131 s\u00f6yleyen <strong>Frederic Xerri<\/strong>; \u201c2019\u2019da nesnelerin internetinden <strong>450 milyon euro<\/strong> ciro sa\u011flad\u0131k. 2020\u2019de bunu <strong>1 milyar euroya<\/strong> \u00e7\u0131karmay\u0131 hedefliyoruz. <strong>Nesnelerin interneti<\/strong> ile arkas\u0131na girilmeyen b\u00fcy\u00fck <strong>nesnelerin uzaktan bak\u0131m ve onar\u0131m\u0131<\/strong> yap\u0131labilecek<\/em><strong>.\u201d<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bina, elektrik ve dijital altyap\u0131lar i\u00e7in \u00fcr\u00fcn ve sistemler geli\u015ftiren Frans\u0131z devi Legrand Grup, T\u00fcrkiye\u2019deki yat\u0131r\u0131mlar\u0131na devam ediyor. Son d\u00f6nemdeki ekonomik dalgalanmalara [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":106243,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[64712,64705,64708,52674,64707,52259,64711,64706,10266,27989,37910,64710,39268,64709],"views":214,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106240"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=106240"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106240\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/106243"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=106240"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=106240"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=106240"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}