{"id":106125,"date":"2020-01-09T15:32:26","date_gmt":"2020-01-09T12:32:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=106125"},"modified":"2020-01-09T15:32:26","modified_gmt":"2020-01-09T12:32:26","slug":"erzincan-havalimani-enerjisini-gunesten-aliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/erzincan-havalimani-enerjisini-gunesten-aliyor\/","title":{"rendered":"(Turkish) &#8217;Erzincan Havaliman\u0131&#8217; Enerjisini G\u00fcne\u015f&#8217;ten Al\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/106125\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Erzincan Havaliman\u0131&#8217;nda yap\u0131lan G\u00fcne\u015f Enerjisinden Elektrik \u00dcretim Tesisi (GES) elektrik \u00fcretmeye ba\u015flad\u0131.<img loading=\"lazy\" class=\"alignright wp-image-106127\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/erzincan-havalimani-enerjisini-gunesten-aliyor.jpg\" alt=\"\" width=\"320\" height=\"232\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/erzincan-havalimani-enerjisini-gunesten-aliyor.jpg 555w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/erzincan-havalimani-enerjisini-gunesten-aliyor-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/erzincan-havalimani-enerjisini-gunesten-aliyor-500x363.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/erzincan-havalimani-enerjisini-gunesten-aliyor-69x50.jpg 69w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p>Yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, <strong>Panasonic \u2013 Giri\u015fim Elektrik<\/strong> imzas\u0131 ta\u015f\u0131yan, <strong>Panasonic \u00fcr\u00fcnleri<\/strong>nin kullan\u0131ld\u0131\u011f\u0131 ve<strong> T\u00fcrkiye\u2019de<\/strong>\u00a0Erzincan Havaliman\u0131 <strong>\u00f6z t\u00fcketiminin yar\u0131s\u0131na yak\u0131n\u0131n\u0131<\/strong> kar\u015f\u0131layan ilk projelerden biri olarak\u00a0<strong>G\u00fcne\u015f Enerjisinden Elektrik \u00dcretim Tesisi (GES)<\/strong>\u00a0elektrik enerji \u00fcretimine ge\u00e7ti.<\/p>\n<p><strong>Ges yat\u0131r\u0131m\u0131 anahtar teslim olarak<\/strong> hayata ge\u00e7iren<strong> Giri\u015fim Elektrik<\/strong> taraf\u0131ndan <span style=\"text-decoration: underline;\">verilen bilgilere g\u00f6re;<\/span> tesis, <strong>Erzincan Havaliman\u0131<\/strong>\u2019nda t\u00fcketilen elektrik enerjisinin <strong>%50&#8217;ye<\/strong> yak\u0131n\u0131n\u0131 kar\u015f\u0131layacak ve <strong>ihtiya\u00e7 fazlas\u0131n\u0131 \u015febekeye<\/strong> geri kazand\u0131racakt\u0131r. Proje i\u00e7in <strong>3.779 adet<\/strong> 325 W panel yerle\u015ftirilerek 1228 kWp g\u00fc\u00e7 elde edilmekte olup <strong>Panasonic HIT \u00fcr\u00fcn\u00fc<\/strong>n\u00fcn kullan\u0131ld\u0131\u011f\u0131 ges projesi\u00a0<strong>7 ayda<\/strong> tamamlanarak hayata ge\u00e7irildi. <strong>Giri\u015fim Elektrik<\/strong>, proje i\u00e7in <strong>inverter ve optimizer teknolojisinin<\/strong> destekledi\u011fi <strong>panel bazl\u0131 izleme sistemi<\/strong> de tesis edip, <strong>SCADA sistemiyle<\/strong> enerji \u00fcretilebilirli\u011fi y\u00fcksek seviyelerde tutarak <strong>projenin son haline<\/strong> gelmesini sa\u011flad\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Erzincan Havaliman\u0131&#8217;nda yap\u0131lan G\u00fcne\u015f Enerjisinden Elektrik \u00dcretim Tesisi (GES) elektrik \u00fcretmeye ba\u015flad\u0131. Yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Panasonic \u2013 Giri\u015fim Elektrik imzas\u0131 ta\u015f\u0131yan, Panasonic [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":106127,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[3804,5070,52674,52259,64586,53562,61812,11263,64587,12474,64592,64589,64585,64590,64591,64588,64593,3736,846],"views":308,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106125"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=106125"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106125\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/106127"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=106125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=106125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=106125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}