{"id":106082,"date":"2020-01-09T12:47:31","date_gmt":"2020-01-09T09:47:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=106082"},"modified":"2020-01-09T12:47:31","modified_gmt":"2020-01-09T09:47:31","slug":"almanya-dan-35-yillik-nukleer-reaktoru-kapatma-karari","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/almanya-dan-35-yillik-nukleer-reaktoru-kapatma-karari\/","title":{"rendered":"(Turkish) &#8217;Almanya&#8217;dan 35 Y\u0131ll\u0131k N\u00fckleer Reakt\u00f6r\u00fc Kapatma Karar\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/106082\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Almanya, 35 y\u0131ld\u0131r hizmet veren Baden-W\u00fcrttemberg&#8217;nin elektrik ihtiyac\u0131n\u0131n % 6\u2019s\u0131n\u0131 kar\u015f\u0131lamakta olan &#8216;Philippsburg 2 N\u00fckleer \u00dcnitesi&#8217;ni kapatmak \u00fczere <img loading=\"lazy\" class=\"alignright wp-image-106084\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/almanya-dan-35-yillik-nukleer-reaktoru-kapatma-karari.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/almanya-dan-35-yillik-nukleer-reaktoru-kapatma-karari.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/almanya-dan-35-yillik-nukleer-reaktoru-kapatma-karari-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/almanya-dan-35-yillik-nukleer-reaktoru-kapatma-karari-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/almanya-dan-35-yillik-nukleer-reaktoru-kapatma-karari-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/strong><\/h1>\n<p><strong>1985 y\u0131l\u0131nda<\/strong> hizmete girerek \u00e7al\u0131\u015fma \u00f6mr\u00fc boyunca <strong>355 terawattsaat elektrik \u00fcreten<\/strong>\u00a0Philippsburg 2\u2019nin so\u011futma kulelerinin <strong>2020 y\u0131l\u0131nda<\/strong> s\u00f6k\u00fcm\u00fc yap\u0131lacak.<\/p>\n<p>&#8216;Philippsburg 2\u2019nin <strong>1392 megawatt kapasitesi<\/strong> bulunurken, Philippsburg 1 <strong>2011 y\u0131l\u0131nda<\/strong> kapat\u0131l\u0131rken\u00a0<strong>Fukushima <\/strong>sonras\u0131\u00a0<strong>2022 y\u0131l\u0131na kadar<\/strong>\u00a017 <strong>n\u00fckleer santrali kapatma karar\u0131<\/strong> alan Almanya, b\u00f6lgede yer alan <strong>2&#8217;inci santral<\/strong> olan <strong>Neckarwestheim 2<\/strong>\u2019yi ise a\u015famal\u0131 olarak <strong>2022 y\u0131l\u0131na<\/strong> kadar devre d\u0131\u015f\u0131 b\u0131rakacakt\u0131r&#8230;<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.neimagazine.com\/news\/newsgermany-shuts-down-philippsburg-2-7585797\" target=\"_blank\" rel=\"noopener\">Nuclear Engineering Magazine<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Almanya, 35 y\u0131ld\u0131r hizmet veren Baden-W\u00fcrttemberg&#8217;nin elektrik ihtiyac\u0131n\u0131n % 6\u2019s\u0131n\u0131 kar\u015f\u0131lamakta olan &#8216;Philippsburg 2 N\u00fckleer \u00dcnitesi&#8217;ni kapatmak \u00fczere \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. 1985 y\u0131l\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":106084,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[25954,55409,52259,14792,64553,36443,53348,42363,64554,64552],"views":310,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106082"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=106082"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106082\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/106084"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=106082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=106082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=106082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}