{"id":105969,"date":"2020-01-07T15:20:40","date_gmt":"2020-01-07T12:20:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=105969"},"modified":"2020-01-07T15:20:40","modified_gmt":"2020-01-07T12:20:40","slug":"kastamonu-entegrenin-ilk-surdurulebilirlik-raporu-yayinda","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kastamonu-entegrenin-ilk-surdurulebilirlik-raporu-yayinda\/","title":{"rendered":"(Turkish) &#8217;Kastamonu Entegre&#8217;nin \u0130lk S\u00fcrd\u00fcr\u00fclebilirlik Raporu&#8217; Yay\u0131nda!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/105969\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Kuruldu\u011fu g\u00fcnden bug\u00fcne do\u011fal dengeyi koruma ve topluma katk\u0131 sa\u011flama misyonuyla hareket eden a\u011fa\u00e7 bazl\u0131 panel sekt\u00f6r\u00fcn\u00fcn global oyuncusu Kastamonu Entegre, ilk S\u00fcrd\u00fcr\u00fclebilirlik Raporu\u2019nu sekt\u00f6r profesyonelleriyle payla\u015ft\u0131. Kurumsal y\u00f6netim ilkelerinin ayr\u0131lmaz bile\u015feni olan s\u00fcrd\u00fcr\u00fclebilirlik yakla\u015f\u0131m\u0131na ili\u015fkin \u00e7al\u0131\u015fmalar\u0131 ilk kez bu raporda bir araya getiren \u015firket, \u00f6n\u00fcm\u00fczdeki d\u00f6nemde \u0130klim Eylemi hedefine uygun, yenilenebilir ve inovatif enerji projelerine h\u0131z kazand\u0131rmay\u0131 hedefliyor.<\/strong><\/h1>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-105971\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kastamonu-entegrenin-ilk-surdurulebilirlik-raporu-yayinda-2.jpg\" alt=\"\" width=\"320\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kastamonu-entegrenin-ilk-surdurulebilirlik-raporu-yayinda-2.jpg 746w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kastamonu-entegrenin-ilk-surdurulebilirlik-raporu-yayinda-2-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kastamonu-entegrenin-ilk-surdurulebilirlik-raporu-yayinda-2-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kastamonu-entegrenin-ilk-surdurulebilirlik-raporu-yayinda-2-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>50 y\u0131ld\u0131r<\/strong> s\u00fcregelen faaliyetlerini <strong>\u00e7evresel, ekonomik, sosyal katk\u0131 sunma prensibiyle<\/strong> y\u00fcr\u00fcten <strong>Kastamonu Entegre<\/strong>, 2014\u2019ten g\u00fcn\u00fcm\u00fcze finansal kurumlara y\u00f6nelik haz\u0131rlad\u0131\u011f\u0131 <strong>Faaliyet Raporu<\/strong>\u2019na ek olarak, bu y\u0131l ilk kez <strong>S\u00fcrd\u00fcr\u00fclebilirlik Raporu<\/strong>\u2019nu payda\u015flar\u0131na sundu. Rapor, Kastamonu Entegre S\u00fcrd\u00fcr\u00fclebilirlik \u00c7al\u0131\u015fma Grubu taraf\u0131ndan, K\u00fcresel Raporlama Giri\u015fimi (Global Reporting Initiative &#8211; GRI) standartlar\u0131 referans al\u0131narak haz\u0131rland\u0131. <strong>Birle\u015fmi\u015f Milletler S\u00fcrd\u00fcr\u00fclebilir Kalk\u0131nma Hedefleri<\/strong> rapora \u00f6nemli bir girdi sa\u011flarken, \u015firketin s\u00fcrd\u00fcr\u00fclebilirlik konusundaki \u00f6ncelikleri, <strong>Payda\u015f ve S\u00fcrd\u00fcr\u00fclebilirlik Komitesi<\/strong> geri bildirimlerine g\u00f6re belirlendi.<\/p>\n<h2><strong>ECOBULK projesinde T\u00fcrkiye\u2019yi temsil ediyor<\/strong><\/h2>\n<p>A\u011fa\u00e7 bazl\u0131 panel sekt\u00f6r\u00fcn\u00fcn T\u00fcrkiye lideri ve d\u00fcnyan\u0131n <strong>7&#8217;inci b\u00fcy\u00fck \u00fcreticisi<\/strong> olan; <strong>MDF, yonga levha, laminat parke ve kap\u0131 paneli \u00fcr\u00fcnlerinde<\/strong> ise d\u00fcnyan\u0131n <strong>ilk 4 \u00fcreticisi aras\u0131nda<\/strong> yer alan <strong>Kastamonu Entegre,<\/strong> t\u00fcm i\u015f s\u00fcre\u00e7lerini <strong>\u00e7evresel, sosyal ve ekonomik etkileri<\/strong> g\u00f6zeterek ger\u00e7ekle\u015ftiriyor. Hammaddesini <strong>s\u00fcrd\u00fcr\u00fclebilir ve yenilenebilir sertifikal\u0131 kaynaklardan<\/strong> temin ederek <strong>d\u00f6ng\u00fcsel ekonomiye odaklanan<\/strong> \u015firket, her at\u0131\u011f\u0131n tekrar de\u011ferlendirildi\u011fi \u00e7\u00f6z\u00fcmler geli\u015ftiriyor. Kastamonu Entegre, <strong>geri d\u00f6n\u00fc\u015f\u00fcm<\/strong> y\u00fczdesini artt\u0131ran <strong>\u00fcr\u00fcn tasar\u0131m\u0131 ve \u00fcretimi, tersine lojistik zincirlerinin<\/strong> kurulmas\u0131, at\u0131k ak\u0131\u015flar\u0131n\u0131n daha iyi y\u00f6netilmesi ve izlenmesi hedefiyle, 13 \u00fclkeden payda\u015flar\u0131n yer ald\u0131\u011f\u0131 <strong>ECOBULK projesi<\/strong>ne, T\u00fcrkiye\u2019den tek \u00e7\u00f6z\u00fcm orta\u011f\u0131 olarak kat\u0131l\u0131yor. Bu proje ile <strong>at\u0131klardan kompozit levha geli\u015ftiren<\/strong> \u015firket, ayr\u0131ca <strong>\u0130talya\u2019daki<\/strong> tesislerinde <strong>%100 geri d\u00f6n\u00fc\u015f\u00fcml\u00fc<\/strong> hammadde kullanarak, mobilya sekt\u00f6r\u00fcne y\u00f6nelik <strong>ham ve melamin kapl\u0131 yonga levha \u00fcretimi<\/strong> yap\u0131yor.<\/p>\n<p><strong>Kastamonu Entegre<\/strong>, faaliyetlerinin <strong>iklim de\u011fi\u015fikli\u011fi<\/strong> \u00fczerinde olu\u015fturdu\u011fu etkiyi g\u00f6rebilmek ad\u0131na 2015 y\u0131l\u0131nda <strong>karbon ayak izi hesaplamas\u0131na<\/strong> ba\u015flad\u0131. At\u0131klar, \u015firketin <strong>biok\u00fctle enerji santrallerinde<\/strong> elektrik ve \u0131s\u0131ya d\u00f6n\u00fc\u015ft\u00fcr\u00fcl\u00fcyor. Bu y\u00f6ntem sayesinde, <strong>do\u011falgaz kullan\u0131larak<\/strong> \u00fcretilen enerjiye k\u0131yasla <strong>her y\u0131l<\/strong> ortalama <strong>240 bin ton CO<sub>2<\/sub> sal\u0131m\u0131 <\/strong>\u00f6nleniyor.<\/p>\n<p>\u00dclkemizde s\u00fcrd\u00fcr\u00fclebilir orman y\u00f6netimi ve end\u00fcstriyel plantasyon konusunda \u00f6nc\u00fc rol \u00fcstlenen Kastamonu Entegre,<strong> Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131<\/strong> ile <strong>TEMA Vakf\u0131<\/strong> \u00f6nc\u00fcl\u00fc\u011f\u00fcnde kurulan <strong>ENAT A\u015e<\/strong>\u2019nin ikinci b\u00fcy\u00fck orta\u011f\u0131 olarak da \u00f6nemli bir misyon \u00fcstleniyor. <strong>2016 y\u0131l\u0131ndan itibaren<\/strong> sekt\u00f6re odun arz etmeye ba\u015flayan <strong>ENAT A\u015e<\/strong>, bug\u00fcne kadar <strong>14 bin d\u00f6n\u00fcm<\/strong> \u00fczerine 1,7 milyon fidan dikti.<\/p>\n<h2><strong>Y\u0131ld\u0131z: \u201c\u0130klim Eylemi hedefine uygun enerji projeleri geli\u015ftiriyoruz\u201d <\/strong><\/h2>\n<p>G\u00fcn\u00fcm\u00fcz\u00fcn acil \u00e7\u00f6z\u00fcm bekleyen k\u00fcresel sorunlardan birinin iklim krizi oldu\u011funu dile getiren <strong>Kastamonu Entegre CEO\u2019su Haluk Y\u0131ld\u0131z<\/strong>, \u201c<em>Bug\u00fcn en b\u00fcy\u00fck sorumlulu\u011fumuz ekonomik b\u00fcy\u00fcmeyi, d\u00fcnyam\u0131zdaki kaynaklar\u0131 t\u00fcketmeden, verimli bir bi\u00e7imde ger\u00e7ekle\u015ftirmenin yollar\u0131n\u0131 aramakt\u0131r. Kastamonu Entegre olarak, <strong>S\u00fcrd\u00fcr\u00fclebilir Kalk\u0131nma Hedefleri<\/strong>\u2019nden biri olan <strong>\u0130klim Eylemi hedefine<\/strong> uygun, yenilenebilir ve <strong>inovatif enerji projeleri<\/strong> geli\u015ftiriyoruz\u201d <\/em>diyor.<\/p>\n<p><strong>\u201cAt\u0131k Biyok\u00fctlelerin Gazla\u015ft\u0131r\u0131lmas\u0131 ve Yenilenebilir Temiz Enerji \u00dcretimi\u201d<\/strong> projesiyle \u00fcretim tesislerinde proses s\u0131ras\u0131nda ortaya \u00e7\u0131kan at\u0131klar\u0131n, gazla\u015ft\u0131rma tesisinde verimli bir \u015fekilde enerjiye d\u00f6n\u00fc\u015ft\u00fcr\u00fclmesini sa\u011flayan Kastamonu Entegre, bu projesiyle 2018 y\u0131l\u0131nda <strong>ICCI Enerji \u00d6d\u00fclleri<\/strong>\u2019nin &#8220;Biyok\u00fctle ve At\u0131k&#8221; kategorisinde ve <strong>13. Teknoloji \u00d6d\u00fclleri<\/strong>\u2019nin \u201c\u00dcniversite-Sanayi \u0130\u015f Birlikleri\u201d kategorisinde \u00f6d\u00fcle lay\u0131k g\u00f6r\u00fcld\u00fc. Adana fabrikas\u0131na kurulan <strong>G\u00fcne\u015f Enerji Santrali<\/strong> ile <strong>elektrik enerjisini yenilenebilir kaynaklardan<\/strong> sa\u011flayan \u015firket, tesislerindeki <strong>dizel yak\u0131tl\u0131 forkliftleri elektrikli forklifte d\u00f6n\u00fc\u015ft\u00fcrerek<\/strong> hem enerji maliyetlerini d\u00fc\u015f\u00fcrd\u00fc hem de <strong>i\u015f sa\u011fl\u0131\u011f\u0131 ve g\u00fcvenli\u011fi<\/strong> a\u00e7\u0131s\u0131ndan ortaya \u00e7\u0131kabilecek riskleri \u00f6nledi.<\/p>\n<h2><strong>Yerel \u00fcretime ve kad\u0131n istihdam\u0131na katk\u0131<\/strong><\/h2>\n<p>Tedarik zincirinin s\u00fcrd\u00fcr\u00fclebilirli\u011fini g\u00f6zeterek, ithal \u00fcr\u00fcnlerin <strong>yerli ikamelerine ge\u00e7ilmesi<\/strong> ad\u0131na yerlile\u015ftirme projesini ba\u015flatan \u015firket, sat\u0131n alma ve lojistik maliyetlerini azalt\u0131rken, yerel \u00fcretime katk\u0131da bulundu ve istihdam\u0131 art\u0131rd\u0131. Mesafeye ba\u011fl\u0131 <strong>karbon sal\u0131m\u0131n\u0131 da azaltan<\/strong> yerlile\u015ftirme projesi ile y\u0131l i\u00e7inde <strong>8,5 milyon TL<\/strong> tutar\u0131nda tasarruf sa\u011fland\u0131.<\/p>\n<p>Di\u011fer yandan \u00fcretimde <strong>kad\u0131n istihdam\u0131n\u0131 artt\u0131rmaya<\/strong> d\u00f6n\u00fck \u00e7al\u0131\u015fmalar y\u00fcr\u00fcten <strong>Kastamonu Entegre\u2019nin<\/strong> Gebze tesisindeki hatlardan baz\u0131lar\u0131nda <strong>kad\u0131n operat\u00f6r say\u0131s\u0131n\u0131n artt\u0131r\u0131lmas\u0131na<\/strong> y\u00f6nelik uygulamalar ba\u015flat\u0131ld\u0131. <strong>Genel M\u00fcd\u00fcrl\u00fck&#8217;teki<\/strong> idari fonksiyonlarda ise <strong>2014 &#8211; 2018 y\u0131llar\u0131<\/strong> aras\u0131nda<strong> kad\u0131n \u00e7al\u0131\u015fan say\u0131s\u0131nda % 72\u2019lik art\u0131\u015f<\/strong> g\u00f6zlendi.<\/p>\n<h2><strong>Rapora internetten ula\u015fabilirsiniz&#8230;<\/strong><\/h2>\n<p><strong>Kastamonu Entegre\u2019nin<\/strong> \u00e7evresel etkileri <strong>asgari d\u00fczeye indirmek<\/strong> amac\u0131yla haz\u0131rlad\u0131\u011f\u0131 <strong>Kastamonu Entegre 2018 S\u00fcrd\u00fcr\u00fclebilirlik Raporu<\/strong>\u2019na dijital ortamda, <a href=\"http:\/\/www.keas.com.tr\" target=\"_blank\" rel=\"noopener\">www.keas.com.tr <\/a>adresinden ula\u015f\u0131labilir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kuruldu\u011fu g\u00fcnden bug\u00fcne do\u011fal dengeyi koruma ve topluma katk\u0131 sa\u011flama misyonuyla hareket eden a\u011fa\u00e7 bazl\u0131 panel sekt\u00f6r\u00fcn\u00fcn global oyuncusu Kastamonu Entegre, ilk [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":105972,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,52,49],"tags":[64463,48240,64464,4387,64462,64465,40807,64466,52259,26559,23861,48250,44789,44889,33861,41159,64459,64461,64467,59183,37619,64469,64458,11434,37032,872,45699,9309,54979,793,64460,64468],"views":239,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105969"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=105969"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105969\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/105972"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=105969"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=105969"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=105969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}