{"id":105836,"date":"2020-01-05T16:13:28","date_gmt":"2020-01-05T13:13:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=105836"},"modified":"2020-01-05T16:13:28","modified_gmt":"2020-01-05T13:13:28","slug":"alasehir-2-jes-in-kurulu-gucu-186-mwa-dusuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alasehir-2-jes-in-kurulu-gucu-186-mwa-dusuruldu\/","title":{"rendered":"(Turkish) &#8217;Ala\u015fehir 2 JES&#8217;in Kurulu G\u00fcc\u00fc 18,6MW\u2019a D\u00fc\u015f\u00fcr\u00fcld\u00fc"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/105836\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Zorlu Enerji\u2019ye ait Ala\u015fehir II JES\u2019te <img loading=\"lazy\" class=\"alignright wp-image-105839\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/alasehir-2-jes-in-kurulu-gucu-186-mwa-dusuruldu.jpg\" alt=\"\" width=\"320\" height=\"207\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/alasehir-2-jes-in-kurulu-gucu-186-mwa-dusuruldu.jpg 754w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/alasehir-2-jes-in-kurulu-gucu-186-mwa-dusuruldu-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/alasehir-2-jes-in-kurulu-gucu-186-mwa-dusuruldu-500x324.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/alasehir-2-jes-in-kurulu-gucu-186-mwa-dusuruldu-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kurulu g\u00fc\u00e7 24,9MW&#8217;tan 18,6MW d\u00fczeyine d\u00fc\u015f\u00fcr\u00fcld\u00fc.<\/strong><\/h1>\n<p><strong>EPDK<\/strong>, Zorlu Enerji Elektrik \u00dcretim A\u015e.\u2019nin <strong>%100<\/strong> ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan <strong>Zorlu Jeotermal Enerji Elektrik \u00dcretim A\u015e<\/strong>\u2019nin <strong>Manisa<\/strong> ili <strong>Ala\u015fehir<\/strong> il\u00e7esinde <strong>sondaj ve in\u015faat faaliyetleri<\/strong> s\u00fcren <strong>Ala\u015fehir II Jeotermal Enerji Santrali (JES) Projesi<\/strong>\u2019nin <strong>\u00fcretim lisans\u0131<\/strong>nda yer alan kurulu g\u00fcc\u00fcn\u00fc, <strong>24,9 MW<\/strong> d\u00fczeyinden, <strong>18,6 MW<\/strong> d\u00fczeyine indirdi.<\/p>\n<p>\u015eirket, kurulu g\u00fc\u00e7teki revizeye y\u00f6nelik <strong>EPDK\u2019ya<\/strong> ba\u015fvurunu da ger\u00e7ekle\u015ftirmi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Zorlu Enerji\u2019ye ait Ala\u015fehir II JES\u2019te kurulu g\u00fc\u00e7 24,9MW&#8217;tan 18,6MW d\u00fczeyine d\u00fc\u015f\u00fcr\u00fcld\u00fc. EPDK, Zorlu Enerji Elektrik \u00dcretim A\u015e.\u2019nin %100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":105839,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[25670,64281,23466,53114,52259,750,64283,53268,36184,2191,64282,54979,6660,344,20902,64280],"views":771,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105836"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=105836"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105836\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/105839"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=105836"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=105836"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=105836"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}