{"id":105782,"date":"2020-01-04T21:12:14","date_gmt":"2020-01-04T18:12:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=105782"},"modified":"2020-01-04T21:14:48","modified_gmt":"2020-01-04T18:14:48","slug":"izmirde-15-mwlik-harmandali-biyogaz-tesisi-hizmeti-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmirde-15-mwlik-harmandali-biyogaz-tesisi-hizmeti-girdi\/","title":{"rendered":"(Turkish) \u0130zmir\u2019de 15 MW\u2019l\u0131k Harmandal\u0131 Biyogaz Tesisi Hizmeti Girdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/105782\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan \u015fehrin en \u00f6nemli \u00e7evre projelerinden birisi olan\u00a0\u00c7i\u011fli\u2019de yer alan 90 bin konutun elektrik ihtiyac\u0131na denk gelen 15 MW\u2019l\u0131k <img loading=\"lazy\" class=\"alignright wp-image-105785\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/izmir-de-15-mw-lik-harmandali-biyogaz-tesisi-hizmeti-girdi.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/izmir-de-15-mw-lik-harmandali-biyogaz-tesisi-hizmeti-girdi.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/izmir-de-15-mw-lik-harmandali-biyogaz-tesisi-hizmeti-girdi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/izmir-de-15-mw-lik-harmandali-biyogaz-tesisi-hizmeti-girdi-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/izmir-de-15-mw-lik-harmandali-biyogaz-tesisi-hizmeti-girdi-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Harmandal\u0131 Biyogaz Tesisi daha hizmete girdi.<\/h1>\n<p>At\u0131klardan meydana gelen <strong>metan gaz\u0131ndan elektrik enerjisine<\/strong> d\u00f6n\u00fc\u015f\u00fcm sa\u011flayacak\u00a0<strong>15 mw kurulu g\u00fcce<\/strong> sahip<strong> biyogaz tesisi,<\/strong> y\u0131lda yakla\u015f\u0131k <strong>90 bin ailenin<\/strong> elektrik t\u00fcketimine kar\u015f\u0131l\u0131k gelecek\u00a0<strong>enerji \u00fcretimi<\/strong> yap\u0131lacakt\u0131r. Tesis ile y\u0131lda yakla\u015f\u0131k <strong>80 milyon metrek\u00fcp<\/strong> <em>metan gaz\u0131 bertaraf<\/em> edilerek y\u0131lda yakla\u015f\u0131k <strong>160 bin megavat saat<\/strong> <em>elektrik enerjisi \u00fcretimi<\/em> ger\u00e7ekle\u015ftirilecektir.<\/p>\n<h2>4 At\u0131k Tesisi Daha Yolda<\/h2>\n<p><strong>\u0130zmir B\u00fcy\u00fck\u015fehir Belediye<\/strong> Ba\u015fkan\u0131 <strong>Tun\u00e7 Soyer<\/strong>, yapt\u0131\u011f\u0131 a\u00e7\u0131klamada,\u00a0<strong>at\u0131klardan elektrik enerjisi \u00fcretimi<\/strong>ne ba\u015flayarak <strong>depolama sahas\u0131n\u0131<\/strong> da <strong>rehabilite<\/strong> ettik. Bununla s\u0131n\u0131rl\u0131 kalmayaca\u011f\u0131z, <strong>4 yeni at\u0131k tesisini<\/strong> de en k\u0131sa zaman i\u00e7inde hayata ge\u00e7irece\u011fiz&#8221; ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan \u015fehrin en \u00f6nemli \u00e7evre projelerinden birisi olan\u00a0\u00c7i\u011fli\u2019de yer alan 90 bin konutun elektrik ihtiyac\u0131na denk gelen 15 MW\u2019l\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":105785,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[3999,64247,64245,23885,64246,64244,641,4076,64241,5070,64242,2689,10632,64243,28602,54979,25569],"views":541,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105782"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=105782"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105782\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/105785"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=105782"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=105782"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=105782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}