{"id":105649,"date":"2020-01-02T00:18:43","date_gmt":"2020-01-01T21:18:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=105649"},"modified":"2020-01-02T00:21:11","modified_gmt":"2020-01-01T21:21:11","slug":"agaoglu-2019-yilini-enerji-yatirimiyla-kapatti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/agaoglu-2019-yilini-enerji-yatirimiyla-kapatti\/","title":{"rendered":"(Turkish) A\u011fao\u011flu 2019 Y\u0131l\u0131n\u0131 Enerji Yat\u0131r\u0131m\u0131yla Kapatt\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/105649\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>A\u011fao\u011flu Enerji Grubu taraf\u0131ndan 125 MW kurulu g\u00fcc\u00fc olan ve yakla\u015f\u0131k 850 milyon liral\u0131k yat\u0131r\u0131m yap\u0131lan Bal\u0131kesir Tatl\u0131p\u0131nar RES projesinin 1&#8217;inci faz\u0131 devreye al\u0131nd\u0131. Proje 2&#8217;inci faz\u0131 ise 2020 y\u0131l\u0131nda devreye al\u0131nmas\u0131yla<strong><img loading=\"lazy\" class=\"alignright wp-image-105651\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/agaoglu-2019-yilini-enerji-yatirimiyla-kapatti.jpg\" alt=\"\" width=\"320\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/agaoglu-2019-yilini-enerji-yatirimiyla-kapatti.jpg 752w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/agaoglu-2019-yilini-enerji-yatirimiyla-kapatti-300x158.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/agaoglu-2019-yilini-enerji-yatirimiyla-kapatti-500x263.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/agaoglu-2019-yilini-enerji-yatirimiyla-kapatti-80x42.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong> tamamlanarak toplam da 227 MW kurulu g\u00fcce ula\u015f\u0131lacak.<\/h1>\n<p><strong>A\u011fao\u011flu Enerji<\/strong> Grubu Ba\u015fkan\u0131 <strong>Hakk\u0131 A\u011fao\u011flu <\/strong>yapt\u0131\u011f\u0131 a\u00e7\u0131klamada,\u00a0&#8220;\u00d6zellikle yenilenebilir enerji yat\u0131r\u0131mlar\u0131nda h\u0131z kesmeden yolumuza devam ediyoruz. <strong>T\u00fcrkiye ekonomisi<\/strong>ne olan g\u00fcvenimiz ayn\u0131 kararl\u0131l\u0131kla devam ediyor. <strong>Ger\u00e7ekle\u015ftirdi\u011fimiz ve planlad\u0131\u011f\u0131m\u0131z projeler<\/strong> de bu g\u00fcvenin bir g\u00f6stergesidir.&#8221; dedi.<\/p>\n<p><strong>A\u011fao\u011flu Enerji<\/strong> Grubu Genel M\u00fcd\u00fcr\u00fc <strong>Ersan G\u00fclay <\/strong>ise,\u00a0\u201cBu projemizin tamamlanmas\u0131yla Grubun bug\u00fcne kadar geli\u015ftirip hayata ge\u00e7irdi\u011fi <strong>enerji santrallerinin<\/strong> toplam g\u00fcc\u00fc <strong>550 MW\u2019\u0131<\/strong> buluyor. T\u00fcrkiye\u2019nin en deneyimli <strong>enerji geli\u015ftirme ekiplerinden<\/strong> birine sahibiz. <strong>Enerji alan\u0131nda<\/strong> yeni f\u0131rsatlara bak\u0131yoruz. Yat\u0131r\u0131mlar\u0131m\u0131za <strong>devam edece\u011fiz<\/strong>.\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. A\u011fao\u011flu Enerji Grubu taraf\u0131ndan 125 MW kurulu g\u00fcc\u00fc olan ve yakla\u015f\u0131k 850 milyon liral\u0131k yat\u0131r\u0131m yap\u0131lan Bal\u0131kesir Tatl\u0131p\u0131nar RES projesinin 1&#8217;inci faz\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":105651,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[56671,24836,64114,53114,64113,52259,64112,2981,36409,35002,52692,35004,53282,61665,2364,1245],"views":375,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105649"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=105649"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105649\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/105651"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=105649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=105649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=105649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}