{"id":10552,"date":"2013-05-06T09:00:07","date_gmt":"2013-05-06T06:00:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10552"},"modified":"2013-05-06T09:01:11","modified_gmt":"2013-05-06T06:01:11","slug":"sirnak-ve-hakkarideki-3-heste-su-tutulmaya-baslandi-8%e2%80%b2i-yolda","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sirnak-ve-hakkarideki-3-heste-su-tutulmaya-baslandi-8%e2%80%b2i-yolda\/","title":{"rendered":"(Turkish) \u015e\u0131rnak ve Hakkari\u2019deki 3 HES\u2019te Su Tutulmaya Ba\u015fland\u0131, 8\u2032i Yolda!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10552\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u015e\u0131rnak ve Hakkari\u2019nin Irak s\u0131n\u0131r\u0131n\u0131n s\u0131f\u0131r noktalar\u0131nda 2008 y\u0131l\u0131nda in\u015faatlar\u0131na ba\u015flanan ve ge\u00e7mi\u015f y\u0131llarda zaman zaman ge\u00e7i\u015f g\u00fczergahlar\u0131n\u0131 b\u00fcy\u00fck oranda kapataca\u011f\u0131 i\u00e7in PKK\u2019l\u0131lar\u0131n sald\u0131r\u0131lar\u0131na u\u011frayan 11 barajdan g\u00f6vde in\u015faat\u0131 tamamlanan 3\u2032\u00fcnde su tutulmaya ba\u015fland\u0131. B\u00f6lgede enerji alan\u0131n\u0131n yan\u0131s\u0131ra ekonomisine b\u00fcy\u00fck katk\u0131 sa\u011flayacak olan barajlar tamamen bitti\u011finde, s\u0131n\u0131r ka\u00e7ak\u00e7\u0131l\u0131\u011f\u0131n\u0131n da \u00f6n\u00fc b\u00fcy\u00fck oranda \u00f6n\u00fcn\u00fcn kesilece\u011fi ve b\u00f6lgede 7 barajdan elde idelecek enerji ile end\u00fcstriyel ve ticari faaliyetlerin ger\u00e7ekle\u015ftirilebilmesinin de \u00f6n\u00fcn\u00fc a\u00e7acak.<\/strong><\/p>\n<p>DS\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Irak ile \u0130ran s\u0131n\u0131r kesimlerinde enerji ve su depolama amac\u0131yla haz\u0131rlad\u0131\u011f\u0131 projeyi 2008 y\u0131l\u0131nda hayata ge\u00e7irdi. B\u00f6lgede \u201cPKK\u2019ya kar\u015f\u0131 g\u00fcvenlik baraj\u0131\u201d olarak nitelendirilen 11 baraj\u0131n ihalesi 2008 y\u0131l\u0131nda yap\u0131larak in\u015faatlar\u0131na ba\u015fland\u0131. 7 barajdan en \u00f6nemlileri olan Silopi, \u015e\u0131rnak ve Uluderebarajlar\u0131n\u0131n g\u00f6vde in\u015faatlar\u0131 tamamlan\u0131p su tutulmaya ba\u015flan\u0131rken, \u015e\u0131rnak\u2019taki di\u011fer 5 baraj ile Hakkari\u2019deki 4 baraj\u0131n i<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/pkk-cekilmesi-hes-hidroelektirk-santral-baraj-sirnak-hakkari-baraj-505x243.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10553\" title=\"pkk-cekilmesi-hes-hidroelektirk-santral-baraj-sirnak-hakkari-baraj-505x243\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/pkk-cekilmesi-hes-hidroelektirk-santral-baraj-sirnak-hakkari-baraj-505x243-300x171.jpg\" alt=\"\" width=\"300\" height=\"171\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/pkk-cekilmesi-hes-hidroelektirk-santral-baraj-sirnak-hakkari-baraj-505x243-300x171.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/pkk-cekilmesi-hes-hidroelektirk-santral-baraj-sirnak-hakkari-baraj-505x243-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/pkk-cekilmesi-hes-hidroelektirk-santral-baraj-sirnak-hakkari-baraj-505x243.jpg 426w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>n\u015faat\u0131n\u0131n yap\u0131mlar\u0131 devam ediyor.<\/p>\n<p>PKK\u2019n\u0131n T\u00fcrkiye\u2019ye giri\u015f ve \u00e7\u0131k\u0131\u015flarda y\u0131llarca \u00f6nemli \u00fcslenme ve ge\u00e7i\u015f g\u00fczergahlar\u0131n\u0131n bulundu\u011fu Irak s\u0131n\u0131r kesimindeki bu barajlar tamamland\u0131\u011f\u0131nda, b\u00f6lgedeki yerle\u015fim birimlerinin adeta ge\u00e7im kayna\u011f\u0131 olarak g\u00f6rd\u00fckleri ka\u00e7ak\u00e7\u0131l\u0131\u011f\u0131 da \u00f6nemli oranda azaltacak. B\u00f6lgede ka\u00e7ak\u00e7\u0131l\u0131kla ge\u00e7imlerini sa\u011flayan baz\u0131 a\u015firetler, ka\u00e7ak mallardan elde ettikleri rant\u0131n kesilece\u011fi endi\u015fesiyle bu barajlar\u0131n yap\u0131m\u0131na kar\u015f\u0131 \u00e7\u0131karken, vatanda\u015flar ise yeni yat\u0131r\u0131mlar ve i\u015f olanaklar\u0131 yaratabilece\u011fi i\u00e7in baraj yap\u0131mlar\u0131n\u0131 olumlu buluyor.<\/p>\n<p>DS\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn sitesinde yer alan bilgiye g\u00f6re, Uludere\u2019nin Hezil ve Ortasu (Roboski) \u00e7aylar\u0131 \u00fczerinde in\u015faat\u0131 s\u00fcren barajlardan Silopi, \u015e\u0131rnak, Uludere, Ball\u0131, Kav\u015faktepe, Musatepe ve \u00c7etintepe tamamland\u0131\u011f\u0131nda, y\u0131lda yakla\u015f\u0131k 40 bin (GWh) Gigavatsaat enerji \u00fcretecek. Hakkari\u2019nin G\u00fczeldere \u00c7ay\u0131 \u00fczerinde G\u00f6lgeliyama\u00e7 ve \u00c7ocuktepe, \u015eemdinli ile Y\u00fcksekova il\u00e7eleri aras\u0131ndaki Bembo \u00c7ay\u0131 \u00fczerinde yap\u0131lan Beyyurdu ve Aslanda\u011f barajlar\u0131n\u0131n ise y\u0131lda ne kadar enerji \u00fcretece\u011fi ile ilgili bilgiler hen\u00fcz a\u00e7\u0131klanmad\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/05\/05\/pkknin-cekilmesiyle-sirnak-ve-hakkarideki-3-heste-su-tutulmaya-baslandi-8i-yolda\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u015e\u0131rnak ve Hakkari\u2019nin Irak s\u0131n\u0131r\u0131n\u0131n s\u0131f\u0131r noktalar\u0131nda 2008 y\u0131l\u0131nda in\u015faatlar\u0131na ba\u015flanan ve ge\u00e7mi\u015f y\u0131llarda zaman zaman ge\u00e7i\u015f g\u00fczergahlar\u0131n\u0131 b\u00fcy\u00fck oranda kapataca\u011f\u0131 i\u00e7in PKK\u2019l\u0131lar\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10553,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1990,5114,63,67,35370,1090,5113],"views":2544,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10552"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10552"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10552\/revisions"}],"predecessor-version":[{"id":10556,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10552\/revisions\/10556"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10553"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}