{"id":10549,"date":"2013-05-05T21:27:23","date_gmt":"2013-05-05T18:27:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10549"},"modified":"2013-05-05T21:27:23","modified_gmt":"2013-05-05T18:27:23","slug":"insaati-durdurulmus-santrallere-yeniden-start","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/insaati-durdurulmus-santrallere-yeniden-start\/","title":{"rendered":"(Turkish) \u0130n\u015faat\u0131 Durdurulmu\u015f Santrallere Yeniden Start&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10549\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Yeni Elektrik Piyasas\u0131 Kanunu`nun \u00e7\u0131kmas\u0131ndan \u00f6nce herhangi bir nedenle iptal edilmi\u015f elektrik \u00fcretim lisanslar\u0131, sahiplerine yeniden verilecek. Hakk\u0131nda y\u00fcr\u00fctmeyi durdurma karar\u0131 verilmi\u015f lisanslar da, iptal edilerek, sahiplerine yeniden lisans verilecek.\u00a0<\/strong><br \/>\n<strong> <\/strong><\/p>\n<p><strong>Elektrik Piyasas\u0131nda \u0130n\u015faat\u0131na Ba\u015flanm\u0131\u015f Olan Tesislere Yeni \u00dcretim Lisans\u0131 Verilmesi Hakk\u0131nda Y\u00f6netmelik, Resmi Gazete`de yay\u0131mlanarak y\u00fcr\u00fcrl\u00fc\u011fe girdi. Y\u00f6netmelik, yeni Elektrik Piyasas\u0131 Kanunu`nun y\u00fcr\u00fcrl\u00fc\u011fe girdi\u011fi 14 Mart 2013 \u00f6ncesi ge\u00e7erli bir \u00fcretim lisans\u0131na dayal\u0131 olarak santral in\u015faat\u0131na ba\u015flam\u0131\u015f ancak \u00fcretim lisans\u0131 herhangi bir sebeple iptal edilmi\u015f veya durdurulmu\u015f lisans sahiplerine, yeni \u00fcretim lisans\u0131 verilmesine ili\u015fkin usul ve esaslar\u0131 d\u00fczenliyor.<\/strong><\/p>\n<p><strong>BAKANLIK GER\u0130 D\u00d6N\u00dcLEMEZ DERSE&#8230;<\/strong><\/p>\n<p>Y\u00f6netmeli\u011fe g\u00f6re, \u00fcretim tesisi yat\u0131r\u0131m\u0131n\u0131n geri d\u00f6n\u00fclemez bir noktaya geldi\u011finin tespit edilmesi halinde, herhangi bir nedenle iptal edilmi\u015f elektrik \u00fcretim lisanslar\u0131n\u0131n sahiplerine Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan yeniden \u00fcretim lisans\u0131 verilecek. Bunun i\u00e7in, lisans sahiplerinin en ge\u00e7 13 Mart 2014 tarihine kadar EPDK`ya b\u015favuruda bulunmas\u0131 gerekiyor. EPDK, kendisine yap\u0131lan ba\u015fvuruyu takip eden be\u015f i\u015f g\u00fcn\u00fc i\u00e7erisinde Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131`ndan santral in\u015faat\u0131n\u0131n geri d\u00f6n\u00fclemez bir a\u015famaya gelip gelmedi\u011finin ve tesisin faaliyete ge\u00e7mesinde kamu yarar\u0131 olup olmad\u0131\u011f\u0131n\u0131n tespit edilmesini talep edecek. Bakanl\u0131k, en ge\u00e7 30 g\u00fcn i\u00e7inde bu ba\u015fvuruyu sonu\u00e7land\u0131rarak EPDK`ya bildirecek.<\/p>\n<p><strong>\u0130N\u015eAAT S\u00dcRES\u0130 DER\u00c7 ED\u0130LECEK<\/strong><\/p>\n<p><em><\/em>Ba\u015fvuruya konu \u00fcretim tesisi yat\u0131r\u0131m\u0131n\u0131n geri d\u00f6n\u00fclemez bir noktaya geldi\u011fi ile kamu yarar\u0131 bulundu\u011funun yaz\u0131l\u0131 olarak Kuruma bildirilmesi halinde lisans sahibi t\u00fczel ki\u015fiye yeniden \u00fcretim lisans\u0131 verilecek. Lisans verme i\u015flemi, \u00fcretim lisans\u0131 b<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/ruzgar-turbini-insaati-durdurulmus-santrallere-yeniden-start.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-10550\" title=\"ruzgar-turbini-insaati-durdurulmus-santrallere-yeniden-start\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/ruzgar-turbini-insaati-durdurulmus-santrallere-yeniden-start-300x216.jpg\" alt=\"\" width=\"300\" height=\"216\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/ruzgar-turbini-insaati-durdurulmus-santrallere-yeniden-start-300x216.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/ruzgar-turbini-insaati-durdurulmus-santrallere-yeniden-start-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/ruzgar-turbini-insaati-durdurulmus-santrallere-yeniden-start.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>a\u015fvuru dosyas\u0131ndaki bilgi ve belgelerin g\u00fcncellenmesinden sonra 10 i\u015f g\u00fcn\u00fc i\u00e7inde tamamlanacak. Yeni lisansa, in\u015faat s\u00fcresi de der\u00e7 edilecek.<\/p>\n<p><strong>Y\u00dcR\u00dcTMES\u0130 DURDURULMU\u015eLAR DA YEN\u0130LEN\u0130YOR<\/strong><\/p>\n<p>Y\u00f6netmelik kapsam\u0131na giren \u00fcretim lisanslar\u0131ndan, haklar\u0131nda y\u00fcr\u00fctmenin durdurulmas\u0131 karar\u0131 verilmi\u015f olan lisans sahibi t\u00fczel ki\u015filere de yeniden \u00fcretim lisans\u0131 verilerek, e\u015fzamanl\u0131 olarak, mevcut \u00fcretim lisanslar\u0131 sona erdirilecek.<\/p>\n<p><strong>BELGES\u0130 EKS\u0130K L\u0130SANSLAR ASKIYA ALINACAK<\/strong><\/p>\n<p><em><\/em>Yeniden \u00fcretim lisans\u0131 verilen t\u00fczel ki\u015fi, belgelerin tamamlanmam\u0131\u015f olmas\u0131 halinde, \u00fcretim tesisi yat\u0131r\u0131m\u0131na ba\u015flanmas\u0131 i\u00e7in mevzuattan kaynaklanan izin, onay, ruhsat ve benzeri belgeleri, lisans alma tarihinden itibaren iki y\u0131l i\u00e7erisinde tamamlayarak Kuruma sunmakla y\u00fck\u00fcml\u00fc k\u0131l\u0131nd\u0131. Bu s\u00fcre i\u00e7erisinde, ilgili t\u00fczel ki\u015fi, \u00fcretim lisans\u0131 ile ilgili t\u00fcm faaliyetlerine devam edecek. Bu s\u00fcre i\u00e7erisinde de gerekli izin, onay, ruhsat ve benzeri belgelerin tamamlanamamas\u0131 halinde, ilgili t\u00fczel ki\u015finin faaliyetleri, s\u00f6z konusu izin, onay, ruhsat ve benzeri belgeler tamamlan\u0131ncaya kadar durdurulacak. Bu husus, ilgili t\u00fczel ki\u015fiye verilecek \u00fcretim lisans\u0131na dercedilecek.<\/p>\n<p><strong>HES`LER Y\u00d6NETMEL\u0130K KAPSAMI DI\u015eINDA<\/strong><\/p>\n<p>Kanunun ge\u00e7ici 14`\u00fcnc\u00fc maddesinin \u00fc\u00e7\u00fcnc\u00fc f\u0131kras\u0131 \u00e7er\u00e7evesinde belirtilen iznin al\u0131nmas\u0131n\u0131n gerekmesi halinde, ilgili t\u00fczel ki\u015fi taraf\u0131ndan G\u0131da, Tar\u0131m ve Hayvanc\u0131l\u0131k Bakanl\u0131\u011f\u0131na, Kanunda belirtilen s\u00fcre i\u00e7inde ba\u015fvuru yap\u0131lmas\u0131 zorunlu. Bu arada, yeni y\u00f6netmelik hidroelektrik \u00fcretim tesisleri i\u00e7in uygulanmayacak.<\/p>\n<p><strong>ESAS S\u00d6ZLE\u015eME DE\u011e\u0130\u015e\u0130KL\u0130KLER\u0130 YAPILACAK<\/strong><\/p>\n<p>Y\u00f6netmelikteki ge\u00e7ici bir maddeyle de yeniden \u00fcretim lisans\u0131 verilen t\u00fczel ki\u015filerin, \u00fcretim lisans\u0131 verilme tarihinden itibaren iki y\u0131l i\u00e7erisinde esas s\u00f6zle\u015fmelerini ilgili mevzuata uygun hale getirmeleri ve asgari sermaye \u015fart\u0131n\u0131 sa\u011flamalar\u0131 zorunlu hale getirildi. Yine ge\u00e7ici maddeye g\u00f6re yeniden \u00fcretim lisans\u0131 verilen t\u00fczel ki\u015finin faaliyetleri, iki y\u0131ll\u0131k s\u00fcre i\u00e7erisinde y\u00fck\u00fcml\u00fcl\u00fcklerini yerine getirmemesi halinde, bu y\u00fck\u00fcml\u00fcl\u00fckler yerine getirilinceye kadar durdurulacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/insaati-durdurulmus-santrallere-yeniden-start_3385.html#.UYakqspsNQU\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yeni Elektrik Piyasas\u0131 Kanunu`nun \u00e7\u0131kmas\u0131ndan \u00f6nce herhangi bir nedenle iptal edilmi\u015f elektrik \u00fcretim lisanslar\u0131, sahiplerine yeniden verilecek. Hakk\u0131nda y\u00fcr\u00fctmeyi durdurma karar\u0131 verilmi\u015f lisanslar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10550,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[1588,4952,63,67],"views":597,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10549"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10549"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10549\/revisions"}],"predecessor-version":[{"id":10551,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10549\/revisions\/10551"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10550"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}