{"id":105487,"date":"2019-12-30T13:38:29","date_gmt":"2019-12-30T10:38:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=105487"},"modified":"2019-12-30T13:38:57","modified_gmt":"2019-12-30T10:38:57","slug":"rosatomun-ruzgar-santrali-elektrik-uretimine-hazir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rosatomun-ruzgar-santrali-elektrik-uretimine-hazir\/","title":{"rendered":"(Turkish) Rosatom&#8217;un R\u00fczgar Santrali Elektrik \u00dcretimine Haz\u0131r"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/105487\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Adygea R\u00fczgar Enerjisi Santrali\u2019nin R\u00fczgar T\u00fcrbinlerinin Devreye Al\u0131nmas\u0131n\u0131n \u0130lk A\u015famas\u0131 Tamamland\u0131.<\/strong><\/h1>\n<p>T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali <strong>Akkuyu NGS<\/strong>\u2019yi in\u015fa eden <strong>Rusya Devlet Atom Enerjisi Kurumu<\/strong> Rosatom\u2019un <strong>Adygea R\u00fczgar Enerji Santrali<\/strong>\u2019nde <strong>r\u00fczgar t\u00fcrbinlerinin<\/strong> devreye al\u0131nmas\u0131n\u0131n ilk a\u015famas\u0131 tamamland\u0131. Rosatom, <strong>d\u00fc\u015f\u00fck karbonlu elektrik \u00fcretimi<\/strong> alan\u0131ndaki projelerinin geli\u015ftirilmesinde \u00f6nemli bir ad\u0131m daha att\u0131.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-105489\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/12\/rosatom-un-ruzgar-santrali-elektrik-uretimine-hazir.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/12\/rosatom-un-ruzgar-santrali-elektrik-uretimine-hazir.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/12\/rosatom-un-ruzgar-santrali-elektrik-uretimine-hazir-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/12\/rosatom-un-ruzgar-santrali-elektrik-uretimine-hazir-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/12\/rosatom-un-ruzgar-santrali-elektrik-uretimine-hazir-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Adygea Cumhuriyeti<\/strong>&#8216;nin <strong>\u015eovgen <\/strong>ve<strong> Giagin<\/strong> il\u00e7elerinde in\u015faat\u0131 tamamlanan ve toplam <strong>150 MW<\/strong> kapasiteye sahip <strong>Adygea R\u00fczgar Enerji Santrali<\/strong>, art\u0131k elektrik \u00fcretmeye haz\u0131r. <strong>32,5 MW<\/strong> Kurulu g\u00fcce sahip ilk <strong>13 r\u00fczg\u00e2r t\u00fcrbini<\/strong> ile ilgili \u00e7al\u0131\u015fmalar tamamland\u0131. Bu, <strong>Rosatom<\/strong> taraf\u0131ndan se\u00e7ilen teknolojinin \u00e7al\u0131\u015fabilirli\u011fini ve t\u00fcm <strong>r\u00fczg\u00e2r t\u00fcrbini sistemlerinin<\/strong> \u00e7al\u0131\u015fmaya haz\u0131r oldu\u011funu do\u011frulad\u0131.<\/p>\n<p>\u0130lk a\u015faman\u0131n ba\u015far\u0131l\u0131 bir \u015fekilde ger\u00e7ekle\u015ftirilmesi, <strong>\u2018Ye\u015fil Kare\u2019 konseptinin uygulanmas\u0131nda<\/strong> yani Rosatom taraf\u0131ndan <strong>d\u00fc\u015f\u00fck karbonlu enerji projeleri<\/strong>nin geli\u015ftirilmesinde \u00f6nemli bir d\u00f6nem oldu. Yeni r\u00fczg\u00e2r enerji santralinde bir dizi <strong>yenilik\u00e7i teknoloji<\/strong> kullan\u0131yor ve onlar\u0131n <strong>b\u00fcy\u00fck \u00e7apta kullan\u0131m\u0131<\/strong> ise ilk kez <strong>Rusya\u2019da<\/strong> ba\u015flad\u0131.<\/p>\n<p><strong>Adygea R\u00fczgar Enerji Santrali<\/strong>\u2019nin in\u015fas\u0131 Rosatom&#8217;un <strong>r\u00fczgar enerjisi projelerinin uygulanmas\u0131n\u0131n<\/strong> t\u00fcm yelpazesinde, yeni yetkinlikler kazanmas\u0131na ve gelecek vaat eden <strong>d\u00fc\u015f\u00fck karbonlu enerji segmentinde<\/strong> geli\u015fme i\u00e7in gerekli zemini olu\u015fturmas\u0131na izin veriyor.<\/p>\n<p>Rosatom Devlet Kurulu\u015funun <strong>R\u00fczg\u00e2r Enerjisi Birimi NovaWind A.\u015e.<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>Alexander Korchagin<\/strong>, \u201cKal\u0131c\u0131 i\u015fletme izinlerinin al\u0131nmas\u0131 ve tesisin <strong>toptan elektrik piyasas\u0131na \u00e7\u0131kart\u0131lmas\u0131<\/strong> i\u00e7in daha \u00e7ok \u00e7al\u0131\u015fmas\u0131 gerekiyor. <strong>2&#8217;inci<\/strong> ve <strong>3&#8217;\u00fcnc\u00fc<\/strong> a\u015famalarla ilgili faaliyetlerin <strong>Ocak 2020\u2019de<\/strong> ba\u015flamas\u0131 planlan\u0131yor.\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Adygea R\u00fczgar Enerjisi Santrali\u2019nin R\u00fczgar T\u00fcrbinlerinin Devreye Al\u0131nmas\u0131n\u0131n \u0130lk A\u015famas\u0131 Tamamland\u0131. T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu NGS\u2019yi in\u015fa eden Rusya Devlet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":105489,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[63902,52842,3019,63906,63903,63904,5070,52259,35002,2587,42759,63905,35004,53282,36999,23130,63907,54979],"views":233,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105487"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=105487"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/105487\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/105489"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=105487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=105487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=105487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}