{"id":10519,"date":"2013-05-04T23:43:10","date_gmt":"2013-05-04T20:43:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10519"},"modified":"2013-05-04T23:43:10","modified_gmt":"2013-05-04T20:43:10","slug":"hanonu-hes-2014-yilinda-bitirilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hanonu-hes-2014-yilinda-bitirilecek\/","title":{"rendered":"(Turkish) Han\u00f6n\u00fc HES 2014 Y\u0131l\u0131nda Bitirilecek!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10519\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Han\u00f6n\u00fc il\u00e7esinde G\u00f6k\u0131rmak \u00fczerine yap\u0131lmas\u0131 planlanan Demirci Reg\u00fclet\u00f6r\u00fc Hidroelektrik Santrali&#8217;nin (HES) 2014 y\u0131l\u0131nda bitirilece\u011fi bildir<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/hanonu-hidroelektrik-santrali-hes.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10520\" title=\"hanonu-hidroelektrik-santrali-hes\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/hanonu-hidroelektrik-santrali-hes-300x204.jpg\" alt=\"\" width=\"300\" height=\"204\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/hanonu-hidroelektrik-santrali-hes-300x204.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/hanonu-hidroelektrik-santrali-hes-1024x696.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/hanonu-hidroelektrik-santrali-hes-500x340.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/hanonu-hidroelektrik-santrali-hes-73x50.jpg 73w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><strong>ildi. <\/strong><\/p>\n<p>Proje M\u00fcd\u00fcr\u00fc R\u0131fk\u0131 T\u00f6remez AA muhabirine yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, il\u00e7enin Derek\u00f6y mevkisinden ba\u015flay\u0131p Sinop&#8217;un Boyabat il\u00e7esi Sak\u0131z k\u00f6y\u00fcnde sonlanacak olan HES projesi \u00e7al\u0131\u015fmalar\u0131n\u0131n h\u0131zl\u0131 bir \u015fekilde devam etti\u011fini s\u00f6yledi.<\/p>\n<p>Projenin 2014 y\u0131l\u0131 May\u0131s ay\u0131na kadar bitirilmesinin beklendi\u011fini belirten T\u00f6remez, Derek\u00f6y mevkisinden kanal ile g\u00f6t\u00fcr\u00fclecek suyun, Boyabat&#8217;\u0131n Sak\u0131z mevkisinde kurulacak santral ile elektri\u011fe d\u00f6n\u00fc\u015fece\u011fini ifade etti.<\/p>\n<p>T\u00f6remez, maliyeti 30 milyon dolar olan projenin, makine ve insan g\u00fcc\u00fc olarak il\u00e7ede ekonomik bir i\u015f alan\u0131 olu\u015fturdu\u011funu ifade ederek, Haziran ay\u0131nda gelecek \u00c7inli m\u00fchendislerle beraber, toplamda 300 ki\u015finin projede \u00e7al\u0131\u015fmaya ba\u015flayaca\u011f\u0131n\u0131 ifade etti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjipostasi.com\/3705-HaberGosterhanonu-hes-2014-yilinda-bitirilecek!.html\" target=\"_blank\">Enerji Postas\u0131<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Han\u00f6n\u00fc il\u00e7esinde G\u00f6k\u0131rmak \u00fczerine yap\u0131lmas\u0131 planlanan Demirci Reg\u00fclet\u00f6r\u00fc Hidroelektrik Santrali&#8217;nin (HES) 2014 y\u0131l\u0131nda bitirilece\u011fi bildirildi. Proje M\u00fcd\u00fcr\u00fc R\u0131fk\u0131 T\u00f6remez AA muhabirine yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10520,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[5092,63,67,5093,35370,1090,1595],"views":2335,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10519"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10519"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10519\/revisions"}],"predecessor-version":[{"id":10522,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10519\/revisions\/10522"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10520"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}