{"id":10459,"date":"2013-05-03T15:52:34","date_gmt":"2013-05-03T12:52:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10459"},"modified":"2013-05-03T15:52:34","modified_gmt":"2013-05-03T12:52:34","slug":"turkmenistana-3-santral-insa-edecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkmenistana-3-santral-insa-edecek\/","title":{"rendered":"(Turkish) T\u00fcrkmenistan&#8217;a 3 Santral \u0130n\u015fa Edecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10459\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div id=\"HaberMetni\">\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td>\n<div>\n<div><img src=\"http:\/\/www.energyworld.com.tr\/newpics\/11413\/020520131841522865482_2.jpg\" alt=\"T\u00fcrkmenistan'a 3 Santral \u0130n\u015fa Edecek\" align=\"left\" \/><strong>\u00c7al\u0131k Enerji, T\u00fcrkmenistan&#8217;da toplam b\u00fcy\u00fckl\u00fc\u011f\u00fc 437.6 megawatt olan 3 enerji santral\u0131 in\u015fa edecek.<\/strong><\/div>\n<\/div>\n<p>\u00c7al\u0131k Holding b\u00fcnyesinde faaliyet g\u00f6steren \u00c7al\u0131k Enerji, T\u00fcrkmenistan&#8217;da do\u011falgaz t\u00fcrbinli 3 elektrik santral\u0131 in\u015fa edecek. \u00dclkenin 3 ayr\u0131 b\u00f6lgesinde kurulacak santrallar\u0131n 421 milyon 475 bin dolara mal olmas\u0131 bekleniyor.<br \/>\nT\u00fcrkmenistan Enerji ve Sanayi Bakanl\u0131\u011f\u0131&#8217;na ba\u011fl\u0131 T\u00fcrkmenenergo kurumunun a\u00e7t\u0131\u011f\u0131 ihaleyi kazanan \u00c7al\u0131k Enerji santrallar\u0131 Ahal&#8217;\u0131n Akbu\u011fday, Lebap&#8217;\u0131n Serdarabat ve Mari&#8217;nin Saparmurat T\u00fcrkmenba\u015f\u0131 il\u00e7elerinde kuracak. 149.2, 146.7 ve 141.7 megawatt \u00fcretim kapasitesine sahip santrallar\u0131n in\u015faat\u0131 bu ay ba\u015flayacak. Yat\u0131r\u0131mlar\u0131n \u015eubat 2014&#8217;te tamamlanmas\u0131 bekleniyor.<br \/>\nA\u015fkabat&#8217;ta Yat\u0131r\u0131m\u0131 Var<\/p>\n<p>\u00dclkede \u00fc\u00e7 santral in\u015fa edecek olan \u00c7al\u0131k Enerji, T\u00fcrkmenistan&#8217;da daha \u00f6nce 6 elektrik santral\u0131 kurmu\u015ftu. \u015eirket, ayr\u0131ca bu \u00fclkede ba\u015fka bir dev enerji projesini daha hayata ge\u00e7iriyor. \u00c7al\u0131k Enerji, A\u015fkabat&#8217;a istikrarl\u0131 elektrik enerjisi sa\u011flanmas\u0131 ve t\u00fcm \u00fclkede bu sekt\u00f6r\u00fcn modernle\u015ftirilmesiyle ilgili projenin ilk a\u015fama ihalesini kazand\u0131. S\u00f6z konusu projenin hayata ge\u00e7irilme s\u00fcresi 5 y\u0131l olarak belirlendi. Proje \u00fc\u00e7 a\u015famada ger\u00e7ekle\u015ftirilecek. \u0130n\u015faat\u0131 planlanan alt istasyonlar\u0131n 60&#8217;\u0131n\u0131n tamam\u0131 bir elektrik sisteminde birle\u015ftirilecek.<\/p>\n<p><strong>\u0130hracat\u0131 Art\u0131racak<\/strong><\/p>\n<p>T\u00fcrkmen y\u00f6netimi, elektrik ihracat\u0131n\u0131 5 kat daha art\u0131rmay\u0131 planl\u0131yor. 2020 y\u0131l\u0131na kadar sekt\u00f6re 5 milyar dolar\u0131n \u00fczerinde yat\u0131r\u0131m yap\u0131lacak. S\u00f6z konusu elektrik santrallar\u0131 da bu ama\u00e7la in\u015fa ediliyor.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7al\u0131k Enerji, T\u00fcrkmenistan&#8217;da toplam b\u00fcy\u00fckl\u00fc\u011f\u00fc 437.6 megawatt olan 3 enerji santral\u0131 in\u015fa edecek. \u00c7al\u0131k Holding b\u00fcnyesinde faaliyet g\u00f6steren \u00c7al\u0131k Enerji, T\u00fcrkmenistan&#8217;da do\u011falgaz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10460,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[4345,598,5061,68,61,160,19,63,67,3235,1040],"views":917,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10459"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10459"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10459\/revisions"}],"predecessor-version":[{"id":10461,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10459\/revisions\/10461"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10460"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}