{"id":10426,"date":"2013-05-02T16:55:33","date_gmt":"2013-05-02T13:55:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10426"},"modified":"2013-05-02T16:55:33","modified_gmt":"2013-05-02T13:55:33","slug":"sigir-gubresinden-enerji-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sigir-gubresinden-enerji-uretecek\/","title":{"rendered":"(Turkish) S\u0131\u011f\u0131r G\u00fcbresinden Enerji \u00dcretecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10426\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Tar\u0131m \u0130\u015fletmeleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (T\u0130GEM), \u00e7iftliklerinin enerji ihtiyac\u0131n\u0131 s\u0131\u011f\u0131r g\u00fcbresinden kar\u015f\u0131lamak i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 h\u0131zland\u0131rd\u0131.<\/strong><\/p>\n<p>Bu y\u0131l Konya\u2019da bulunan G\u00f6zl\u00fc Tar\u0131m \u0130\u015fletmesi ve \u015eanl\u0131urfa\u2019da bulunan Ceylanp\u0131nar Tar\u0131m \u0130\u015fletmesinde biyogaz tesisi kurmay\u0131 planlayan T\u0130GEM, s\u00f6z konusu tesisi ile hem i\u015fletmelerinin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layarak \u00fcretim maliyetlerini d\u00fc\u015f\u00fcrmek hem de at\u0131k bertaraf\u0131 sa\u011flay\u0131p organik g\u00fcbre elde etmeyi ama\u00e7l\u0131yor.<\/p>\n<p>T\u0130GEM\u2019in ilk biyogaz tesislerinin ham maddesi b\u00fcy\u00fckba\u015f hayvan g\u00fcbresi olacak. T\u0130GEM, bu y\u0131l i\u00e7inde Bursa Karacabey Tar\u0131m \u0130\u015fletmesi, Aksaray Ko\u00e7a\u015f Tar\u0131m \u0130\u015fletmesi, \u00f6n\u00fcm\u00fczdeki y\u0131l da Eski\u015fehir\u2019deki Anadolu, Ankara\u2019daki Polatl\u0131 ve K\u0131rklareli\u2019de faaliyet g\u00f6steren T\u00fcrkgeldi tar\u0131m i\u015fletmelerinde biyogaz tesisi kurulmas\u0131 i\u00e7in ihaleye \u00e7\u0131kmay\u0131 planl\u0131yor.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sigir-gubresinden-enerji-uretimi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10427\" title=\"sigir-gubresinden-enerji-uretimi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sigir-gubresinden-enerji-uretimi-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sigir-gubresinden-enerji-uretimi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sigir-gubresinden-enerji-uretimi-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sigir-gubresinden-enerji-uretimi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sigir-gubresinden-enerji-uretimi.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>G\u00f6zl\u00fc ve Ceylanp\u0131nar biyogaz tesislerinden bu y\u0131l i\u00e7inde gaz ve enerji \u00fcretmeye ba\u015flanaca\u011f\u0131 tahmin edilirken, tesislerden \u00fcretilen biyogaz, kojenerat\u00f6r sayesinde elektrik ve \u0131s\u0131 enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fclecek.<\/p>\n<p>Elde edilen elektrik enerjisi, b\u00fcy\u00fckba\u015f hayvan tesislerinin ihtiyac\u0131n\u0131 kar\u015f\u0131layacak, \u0131s\u0131 enerjisinden elde edilecek s\u0131cak su da tesisin ihtiyac\u0131nda kullan\u0131lacak. Ayr\u0131ca \u00e7\u0131kan \u0131s\u0131 enerjisinin artan\u0131, olu\u015fturulacak seralarda de\u011ferlendirilecek.<\/p>\n<h2>7 bin hayvan\u0131n g\u00fcbresinden 800 kilovat elektrik enerjisi<\/h2>\n<p>G\u00f6zl\u00fc Tar\u0131m \u0130\u015fletmesindeki tesiste, 2 bin b\u00fcy\u00fckba\u015f hayvandan elde edilen g\u00fcbre ile saatte minimum 225 kilovat elektrik enerjisi ve 280 kilovat \u0131s\u0131 enerjisi \u00fcretilecek.<\/p>\n<p>Ceylanp\u0131nar Tar\u0131m \u0130\u015fletmesinde kurulacak tesiste ise 3 bin b\u00fcy\u00fckba\u015f hayvandan sa\u011flanacak g\u00fcbre ile saatte minimum 350 kilovat elektrik enerjisi ve 400 kilovat \u0131s\u0131 enerjisi \u00fcretilece\u011fi tahmin ediliyor.<\/p>\n<p>Ko\u00e7a\u015f ve Karacabey Tar\u0131m \u0130\u015fletmelerinde kurulacak tesislerde de 2 bin b\u00fcy\u00fckba\u015f hayvan g\u00fcbresinden saatte minimum 225 kilovat elektrik enerjisi ve 280 kilovat \u0131s\u0131 enerjisi \u00fcretilmesi planlan\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/05\/02\/sigir-gubresinden-enerji-uretecek\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Tar\u0131m \u0130\u015fletmeleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (T\u0130GEM), \u00e7iftliklerinin enerji ihtiyac\u0131n\u0131 s\u0131\u011f\u0131r g\u00fcbresinden kar\u015f\u0131lamak i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 h\u0131zland\u0131rd\u0131. Bu y\u0131l Konya\u2019da bulunan G\u00f6zl\u00fc Tar\u0131m \u0130\u015fletmesi ve \u015eanl\u0131urfa\u2019da [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10427,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[641,61,5040,63,67,5038,5039,3109,5035,5036,5037],"views":1536,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10426"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10426"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10426\/revisions"}],"predecessor-version":[{"id":10429,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10426\/revisions\/10429"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10427"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}