{"id":103703,"date":"2019-11-29T12:45:52","date_gmt":"2019-11-29T09:45:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=103703"},"modified":"2019-11-29T12:52:01","modified_gmt":"2019-11-29T09:52:01","slug":"girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti\/","title":{"rendered":"(Turkish) &#8217;Giri\u015fim Elektrik&#8217; Makedonya\u2019da 11.5 MW\u2019l\u0131k GES Projesine \u0130mza Att\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/103703\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Giri\u015fim Elektrik, Kuzey Makedonya\u2019da Avrupa Kalk\u0131nma Bankas\u0131 EBRD\u2019nin finansman\u0131 kullan\u0131larak devletin ilgili kurumlar\u0131nca yat\u0131r\u0131m\u0131 yap\u0131lan ve tamamland\u0131\u011f\u0131nda \u00fclkenin en b\u00fcy\u00fck g\u00fcne\u015f santrali olacak 11.5MW Oslomej g\u00fcne\u015f <img loading=\"lazy\" class=\"alignright wp-image-103705\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti.jpeg\" alt=\"\" width=\"320\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti.jpeg 900w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti-300x170.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti-768x435.jpeg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti-500x283.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/girisim-elektrik-makedonyada-11-5-mwlik-ges-projesine-imza-atti-80x45.jpeg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>santrali i\u00e7in ekonomiden sorumlu ba\u015fbakan yard\u0131mc\u0131s\u0131, ekonomi bakan\u0131 ve ilgili devlet kurumlar\u0131n\u0131n genel m\u00fcd\u00fcrlerinin kat\u0131l\u0131m\u0131yla ger\u00e7ekle\u015ftirilen t\u00f6rende uluslararas\u0131 bas\u0131n \u00f6n\u00fcnde s\u00f6zle\u015fme imzalad\u0131.<\/strong><\/h1>\n<p>\u00c7in\u2019in dev m\u00fcteahhitleri de dahil olmak \u00fczere D\u00fcnya&#8217;n\u0131n ve \u00f6zellikle Avrupa\u2019n\u0131n farkl\u0131 \u00fclkelerinden \u00f6ne \u00e7\u0131kan toplamda <strong>17<\/strong>\u00a0<strong>EPC firmas\u0131n\u0131n<\/strong> kat\u0131l\u0131m\u0131 ile ger\u00e7ekle\u015ftirilen uluslararas\u0131 ihale kapsam\u0131nda\u00a0<strong>Giri\u015fim Elektrik<\/strong> \u00e7ok say\u0131da a\u015famaya ge\u00e7ip ilk s\u0131rada kalarak <strong>s\u00f6zle\u015fme imzalamaya<\/strong> hak kazand\u0131.<\/p>\n<p>EBRD&#8217;nin finanse etti\u011fi y\u00fcksek profilli bu proje \u00fclkemiz ba\u015fta olmak \u00fczere d\u00fcnya g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn gurur kayna\u011f\u0131 oldu&#8230;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Giri\u015fim Elektrik, Kuzey Makedonya\u2019da Avrupa Kalk\u0131nma Bankas\u0131 EBRD\u2019nin finansman\u0131 kullan\u0131larak devletin ilgili kurumlar\u0131nca yat\u0131r\u0131m\u0131 yap\u0131lan ve tamamland\u0131\u011f\u0131nda \u00fclkenin en b\u00fcy\u00fck g\u00fcne\u015f santrali [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":103705,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[50238,1259,52674,52259,7604,28351,61812,53157,61813],"views":580,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/103703"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=103703"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/103703\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/103705"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=103703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=103703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=103703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}