{"id":103345,"date":"2019-11-23T09:10:31","date_gmt":"2019-11-23T06:10:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=103345"},"modified":"2019-11-23T10:47:26","modified_gmt":"2019-11-23T07:47:26","slug":"yeka-ges-3-icin-detaylar-sekillenmeye-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-3-icin-detaylar-sekillenmeye-basladi\/","title":{"rendered":"(Turkish) &#8217;Yeka Ges-3&#8242; \u0130\u00e7in Detaylar \u015eekillenmeye Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/103345\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Yap\u0131lmas\u0131 planlanan Yenilenebilir Enerji Kaynak Alanlar\u0131 ihalesine ili\u015fkin detaylar \u015fekillenmeye ba\u015flad\u0131.<\/strong><\/h1>\n<p>Ge\u00e7ti\u011fimiz d\u00f6nemde T\u00fcrkiye\u2019de <strong>Karap\u0131nar YEKA-1 GES (\u00f6nlisans\u0131 al\u0131nd\u0131), YEKA RES-1 (\u00f6nlisans\u0131 al\u0131nd\u0131), YEKA RES-2 (yar\u0131\u015fmas\u0131 yap\u0131ld\u0131, s\u00f6zle\u015fme imza s\u00fcrecinde)<\/strong> yar\u0131\u015fmalar\u0131 <img loading=\"lazy\" class=\"alignright wp-image-103354\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yeka-ges-3-icin-detaylar-sekillenmeye-basladi-2.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yeka-ges-3-icin-detaylar-sekillenmeye-basladi-2.jpg 696w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yeka-ges-3-icin-detaylar-sekillenmeye-basladi-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yeka-ges-3-icin-detaylar-sekillenmeye-basladi-2-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yeka-ges-3-icin-detaylar-sekillenmeye-basladi-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yeka-ges-3-icin-detaylar-sekillenmeye-basladi-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ger\u00e7ekle\u015fti. Aral\u0131k ay\u0131nda ise <strong>YEKA GES-3\u2019\u00fcn<\/strong> yap\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>YEKA GES-3<\/strong> kapsam\u0131nda belirlenen b\u00f6lgelerde her bir yar\u0131\u015fma <strong>10 MWe<\/strong> olmak \u00fczere toplam <strong>ba\u011flant\u0131 kapasitesi<\/strong> <strong>1.000 MWe<\/strong> olacak \u015fekilde <strong>100 adet yar\u0131\u015fma<\/strong> yap\u0131lmas\u0131 d\u00fc\u015f\u00fcn\u00fcl\u00fcyor.<\/p>\n<p><strong>YEKA GES-3\u2019te Yerli Mal\u0131 Kullan\u0131m Kar\u015f\u0131l\u0131\u011f\u0131 Tahsis (YMKT) <\/strong>y\u00f6ntemi uygulanacak olup\u00a0<strong>15 y\u0131ll\u0131k<\/strong> bir s\u00f6zle\u015fme yap\u0131larak <strong>\u00f6nlisans s\u00fcresi<\/strong> s\u00f6zle\u015fmenin imzalanmas\u0131ndan sonra <strong>24 ay<\/strong>, lisans s\u00fcresi ise <strong>30 y\u0131l<\/strong> olacak. <strong>\u0130n\u015faat s\u00fcresinin<\/strong> ise lisanstan sonra\u00a0<strong>22 ay<\/strong> olmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<h2><strong>Yar\u0131\u015fmayla ilgili di\u011fer \u00f6nemli hususlar <span style=\"text-decoration: underline;\">ise \u015fu \u015fekildedir;<\/span><\/strong><\/h2>\n<p>&#8211; Yar\u0131\u015fmaya sadece <strong>T\u00fcrk Ticaret Kanunu\u2019na<\/strong> g\u00f6re kurulmu\u015f <strong>t\u00fczel ki\u015fi<\/strong> ba\u015fvurabilecek olup bir\u00a0<strong>\u0130\u015f deneyimi<\/strong> ve <strong>Mali yeterlilik<\/strong> \u015fart\u0131 aranmamaktad\u0131r.<\/p>\n<p>&#8211; <strong>Yar\u0131\u015fma ilan\u0131nda<\/strong> yer alacak <strong>kilovatsaat<\/strong> ba\u015f\u0131na <strong>elektrik enerjisi al\u0131m<\/strong> tavan fiyat\u0131 \u00fczerinden <strong>a\u00e7\u0131k eksiltme usul\u00fcne<\/strong> g\u00f6re yap\u0131lacak, <strong>en d\u00fc\u015f\u00fck<\/strong> ve <strong>son teklife<\/strong> ula\u015f\u0131l\u0131nca sonland\u0131racakt\u0131r.<\/p>\n<p>&#8211; <strong>YEKA\u2019larda<\/strong> kurulacak <strong>g\u00fcne\u015f enerjisine dayal\u0131 elektrik enerjisi \u00fcretim tesisinde<\/strong> kullan\u0131lan <strong>g\u00fcne\u015f mod\u00fclleri kristal<\/strong> (silisyum esasl\u0131; tek\/mono veya \u00e7ok\/poli), <strong>ince film<\/strong>, <strong>\u00e7ok katmanl\u0131<\/strong> veya <strong>\u00e7ift y\u00fczl\u00fc (bifacial)<\/strong> teknolojilerinden <strong>bir <\/strong>veya<strong> birka\u00e7\u0131n\u0131<\/strong> i\u00e7erebilir.<\/p>\n<p>&#8211; <strong>Yerli Mal\u0131 Belgeli Aksam<\/strong> ve <strong>Asgari Yerlilik<\/strong> oranlar\u0131n\u0131n ise \u015fu \u015fekilde <span style=\"text-decoration: underline;\">olmas\u0131 beklenmektedir;<\/span><\/p>\n<p>&#8211; G\u00fcne\u015f mod\u00fcl\u00fc <strong>%60<\/strong> ve \u00fczeri, invert\u00f6r <strong>%51<\/strong> ve \u00fczeri, ta\u015f\u0131y\u0131c\u0131 yap\u0131 <strong>%51<\/strong> ve \u00fczeri, <strong>do\u011fru ak\u0131m (DC)<\/strong> g\u00fcne\u015f kablosu <strong>%51<\/strong> ve \u00fczeri <strong>yerli olmas\u0131<\/strong> gerekiyor.<\/p>\n<p>&#8211; <strong>G\u00fcne\u015f mod\u00fcl\u00fcn\u00fcn<\/strong> ise verimi en az <strong>%18<\/strong> olmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p><strong>Teminat Miktarlar\u0131 ise <span style=\"text-decoration: underline;\">\u015fu \u015fekildedir;<\/span><\/strong><\/p>\n<p>Her bir <strong>10 MWe<\/strong> yar\u0131\u015fma i\u00e7in,\u00a0<strong>1 y\u0131l s\u00fcreli<\/strong> ( Ba\u015fvuru A\u015famas\u0131nda ) 500 Bin Dolar,\u00a0<strong>10 y\u0131l s\u00fcreli<\/strong> ( Yar\u0131\u015fman\u0131n Kazan\u0131lmas\u0131 Durumunda S\u00f6zle\u015fmenin \u0130mzalanmas\u0131ndan \u00d6nce ) <strong>1 Milyon Dolar<\/strong> olarak belirtildi.<\/p>\n<p>Dervi\u015f KORKMAZ \u2013 F\u0131rat \u00dcnv. \/ Elektrik Elektronik M\u00fchendisli\u011fi \u2013 <a href=\"mailto:dervis.korkmaz@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">dervis.korkmaz@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yap\u0131lmas\u0131 planlanan Yenilenebilir Enerji Kaynak Alanlar\u0131 ihalesine ili\u015fkin detaylar \u015fekillenmeye ba\u015flad\u0131. Ge\u00e7ti\u011fimiz d\u00f6nemde T\u00fcrkiye\u2019de Karap\u0131nar YEKA-1 GES (\u00f6nlisans\u0131 al\u0131nd\u0131), YEKA RES-1 (\u00f6nlisans\u0131 [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":103354,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[61447,56151,25180,61453,61269,53114,5070,52674,2625,61273,52259,3155,53157,61451,61448,54979,25578,61445,61450,61444,40533,61443,31711,61449,61452,61446],"views":618,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/103345"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=103345"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/103345\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/103354"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=103345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=103345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=103345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}