{"id":103327,"date":"2019-11-22T13:28:54","date_gmt":"2019-11-22T10:28:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=103327"},"modified":"2019-11-22T13:28:54","modified_gmt":"2019-11-22T10:28:54","slug":"izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi\/","title":{"rendered":"(Turkish) &#8217;\u0130zocam&#8217; ENKA\u2019n\u0131n Irak\u2019taki \u0130ki B\u00fcy\u00fck Projesinin Yal\u0131t\u0131m\u0131nda Tercih Edildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/103327\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Dev enerji projelerinin yal\u0131t\u0131m dan\u0131\u015fman\u0131 \u0130zocam, ENKA\u2019n\u0131n Irak\u2019ta ger\u00e7ekle\u015ftirdi\u011fi iki projenin yal\u0131t\u0131m i\u015flerinde tercih etti\u011fi marka oldu. \u0130zocam, Irak\u2019\u0131n Basra b\u00f6lgesindeki Samawa ve Nasiriyah \u015fehirlerinde yap\u0131lmakta olan iki ayr\u0131 kombine \u00e7evrim santraline \u00fcr\u00fcn temin etti.<\/strong><\/h1>\n<p>Bu y\u0131l ba\u015flayan ve 2020 y\u0131l\u0131nda tamamlanmas\u0131 planlanan <strong>Samawa 750 MW<\/strong> Kombine \u00c7evrim Elektrik Santrali projesine <strong>\u0130zocam<\/strong>, 392 m<sup>2<\/sup> TA\u015eY\u00dcN\u00dc \/ 1362,53 m<sup>3<\/sup> XPS \u00fcr\u00fcn sa\u011flad\u0131. <strong>\u0130zocam<\/strong> 2019\u2019da <img loading=\"lazy\" class=\"alignright wp-image-103329\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi-1.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi-1.jpg 867w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi-1-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi-1-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi-1-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/izocam-enkanin-iraktaki-iki-buyuk-projesinin-yalitiminda-tercih-edildi-1-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ba\u015flay\u0131p yine 2020\u2019de tamamlanmas\u0131 programlanan <strong>Nasiriyah\u2019taki DHI QAR 750 MW<\/strong> Kombine \u00c7evrim Santraline de 392 M2 TA\u015eY\u00dcN\u00dc \/ 1342,80 M3 XPS \u00fcr\u00fcn\u00fc temin etti. Kalitesi marka g\u00fcvenli\u011fi nedeniyle tercih edilen <strong>\u0130zocam projelere sat\u0131\u015f<\/strong> a\u015famas\u0131nda teknik destek sa\u011flad\u0131.<\/p>\n<p>T\u00fcrkiye\u2019de <strong>yal\u0131t\u0131m sekt\u00f6r\u00fcn\u00fcn<\/strong> lider kurulu\u015fu <strong>\u0130zocam<\/strong>, T\u00fcrkiye\u2019deki projelerin yan\u0131 s\u0131ra b\u00f6lgedeki di\u011fer <strong>\u00f6nemli enerji projelerine de<\/strong> <strong>yal\u0131t\u0131m dan\u0131\u015fmanl\u0131\u011f\u0131<\/strong> hizmeti sa\u011fl\u0131yor. D\u00fcnyan\u0131n bir\u00e7ok \u00fclkesindeki b\u00fcy\u00fck \u00e7apl\u0131 rafinerilerin kurulum projelerine ihracat ger\u00e7ekle\u015ftiren \u0130zocam, bu alandaki referans listesine daha \u00f6nce <strong>Irak<\/strong>\u2019taki <strong>Besmaya projesini<\/strong> de eklemi\u015f ve <strong>Enka\u2019n\u0131n<\/strong> ana y\u00fcklenici olarak Irak\u2019ta ger\u00e7ekle\u015ftirdi\u011fi <strong>rafineri projesine<\/strong> <strong>yal\u0131t\u0131m malzemeleri ve dan\u0131\u015fmanl\u0131\u011f\u0131 hizmeti<\/strong> sunmu\u015ftu.<\/p>\n<p>\u0130zocam, son d\u00f6nemde T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirilen en \u00f6nemli <strong>enerji projelerine<\/strong> de \u00fcr\u00fcn temin ediyor ve projelerin <strong>yal\u0131t\u0131m s\u00fcrecinde sundu\u011fu dan\u0131\u015fmanl\u0131k hizmeti<\/strong> nedeniyle tercih ediliyor. \u0130zocam, bu \u00e7er\u00e7evede <strong>T\u00dcPRA\u015e<\/strong> ve <strong>STAR rafinelerinin<\/strong> yan\u0131 s\u0131ra, <em>Tufanbeyli, \u0130ncirliova ve Soma\u2019daki<\/em> e<strong>nerji santrallerinin<\/strong> da \u00fcr\u00fcn tedarik\u00e7isi oldu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Dev enerji projelerinin yal\u0131t\u0131m dan\u0131\u015fman\u0131 \u0130zocam, ENKA\u2019n\u0131n Irak\u2019ta ger\u00e7ekle\u015ftirdi\u011fi iki projenin yal\u0131t\u0131m i\u015flerinde tercih etti\u011fi marka oldu. \u0130zocam, Irak\u2019\u0131n Basra b\u00f6lgesindeki Samawa [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":103330,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[6266,61423,52259,26559,1165,6254,945,43364,6690,61422,61425,793,52303,61424,52464],"views":448,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/103327"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=103327"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/103327\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/103330"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=103327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=103327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=103327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}