{"id":10277,"date":"2013-04-29T09:47:07","date_gmt":"2013-04-29T06:47:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10277"},"modified":"2013-04-29T09:47:07","modified_gmt":"2013-04-29T06:47:07","slug":"nukleere-cin-teklifi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nukleere-cin-teklifi\/","title":{"rendered":"(Turkish) N\u00fckleere \u00c7in Teklifi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10277\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Sinop\u2019a yap\u0131lacak n\u00fckleer santral i\u00e7in \u2018Japonya-Fransa\u2019 giri\u015fimiyle yar\u0131\u015fan \u00c7in, T\u00fcrkiye\u2019yle n\u00fckleer teknolojisini payla\u015fmay\u0131 teklif etti. Milliyet\u2019in haberine g\u00f6re \u00c7in taraf\u0131, \u201cBu ticari bir teklif olman\u0131n da \u00f6tesinde, bir kader ortakl\u0131\u011f\u0131 \u00e7a\u011fr\u0131s\u0131d\u0131r\u201d a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131.<\/strong><\/p>\n<p>Sinop\u2019a yap\u0131lacak n\u00fckleer santral ihalesini almak i\u00e7in yar\u0131\u015fan \u00c7in, 8 reakt\u00f6r kurulumunu kapsayan 9600 MW\u2019l\u0131k, b\u00fcy\u00fckl\u00fc\u011f\u00fc 40 milyar dolar\u0131 bulacak projenin tamam\u0131na yak\u0131n\u0131n\u0131 \u00c7inli finans kurulu\u015flar\u0131n\u0131n kredilendirece\u011fini ve T\u00fcrkiye\u2019den elektrik al\u0131m garantisi istemeyeceklerini a\u00e7\u0131klad\u0131.<\/p>\n<p>\u00c7in Guangdong N\u00fckleer Enerji Holding\u2019in Uluslararas\u0131 N\u00fckleer Projeler Genel M\u00fcd\u00fcr Vekili Mao Chun Yang taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, \u201cBu ticari bir teklif olman\u0131n da \u00f6tesinde, T\u00fcrkiye ve \u00c7in i\u00e7in \u00e7ok uzun vadeli bir i\u015fbirli\u011fi, bir kader ortakl\u0131\u011f\u0131 \u00e7a\u011fr\u0131s\u0131d\u0131r\u201d denildi. Sinop\u2019taki santral i\u00e7in Japon &#8211; Frans\u0131z ortakl\u0131\u011f\u0131n\u0131n \u00f6nde oldu\u011fu, hatta may\u0131s ba\u015f\u0131nda projede imzalar\u0131n at\u0131laca\u011f\u0131 belirtiliyor. Bu ortakl\u0131\u011f\u0131n 4 reakt\u00f6r i\u00e7in 22 milyar dolara yak\u0131n teklifle geldi\u011fi ve 5600 MW\u2019l\u0131k santral kurulumu i\u00e7in g\u00f6r\u00fc\u015ft\u00fc\u011f\u00fc belirtiliyor.<\/p>\n<p>Mao Chun Yang ayr\u0131ca projeyle ilgili \u015fu bilgileri verdi: \u201cYerli yat\u0131r\u0131mc\u0131lar\u0131n, \u00c7inli imalat\u00e7\u0131larla birlikte T\u00fcrkiye\u2019de \u00fcretim yapmaya te\u015fvik edilmesi halinde yerlilik pay\u0131n\u0131n 8. reakt\u00f6rde y\u00fczde 80\u2019in \u00fczerine \u00e7\u0131kmas\u0131 hedeflenmekte. Bu sayede T\u00fcrkiye gelecekte kendi n\u00fckleer teknolojisini y\u00f6nlendirip, geli\u015ftirebilecek, yabanc\u0131 kat\u0131l\u0131m olmadan yeni santraller kurabilecektir.\u00a0Yerli imalat do\u011frultusunda geli\u015fen bir n\u00fckleer sanayi, \u00fcretimde 60 &#8211; 100 bin ki\u015fiye de s\u00fcrekli i\u015f imkan\u0131 sa\u011flayacak. \u00c7in ve T\u00fcrkiye\u2019nin in\u015fa edece\u011fi ilk reakt\u00f6r, 2023\u2019te i\u015fletmeye al\u0131nacak, takip eden her y\u0131l yeni bir \u00fcnite daha \u00fcretime ba\u015flayacakt\u0131r.\u201d<\/p>\n<p><strong>Y\u00dcZDE 20 UCUZ ELEKTR\u0130K \u00dcRETECEK<\/strong><\/p>\n<p>\u00c7in\u2019in i\u015fletmedeki 18 ve in\u015faat\u0131 devam eden 28 \u00fcniteyle n\u00fckleer enerji alan\u0131nda d\u00fcnyada en h\u0131zl\u0131 geli\u015fen \u00fclke oldu\u011fu belirtilirken, 2020\u2019de bu rakam\u0131n toplam 80\u2019e ve 2030\u2019da 200\u2019e ula\u015fmas\u0131n\u0131n planland\u0131\u011f\u0131 kaydedildi. Bu tecr\u00fcbeyi T\u00fcrkiye\u2019yle daha ileriye ta\u015f\u0131mak istediklerini belirten Mao Chun Yang a\u00e7\u0131klamada \u015funlar\u0131 kaydetti: \u201cBu ama\u00e7la, \u00c7in Halk Cumhuriyeti, bug\u00fcne de\u011fin yurtd\u0131\u015f\u0131nda yapm\u0131\u015f olaca\u011f\u0131 en b\u00fcy\u00fck yat\u0131r\u0131m\u0131 T\u00fcrkiye\u2019yle birlikte ger\u00e7ekle\u015ftirmeyi teklif ediyor.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/nukleer-HI-147813.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10278\" title=\"nukleer--HI-147813\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/nukleer-HI-147813-300x192.jpg\" alt=\"\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/nukleer-HI-147813-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/nukleer-HI-147813-500x321.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/nukleer-HI-147813-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/nukleer-HI-147813.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>T\u00fcrkiye\u2019de 2 etap halinde, her biri 1.200 MW g\u00fcc\u00fcnde, en son teknoloji 3. nesil, 8 adet ACPR 1000+ n\u00fckleer reakt\u00f6r \u00fcnitesi kurmay\u0131 \u00f6neriyoruz. \u00dcstelik Hazine garantisi istenmeden, tamam\u0131na yak\u0131n\u0131 \u00c7in finans kurulu\u015flar\u0131 taraf\u0131ndan kredilendirilecek olan bu projenin 8 \u00fcnite i\u00e7in bedelinin 40 milyar dolar\u0131 bulaca\u011f\u0131n\u0131 \u00f6ng\u00f6r\u00fcyoruz. Bu finansman imk\u00e2nlar\u0131n\u0131, bizimle ayn\u0131 ko\u015fullar alt\u0131nda projeye T\u00fcrkiye\u2019den kat\u0131lacak ortaklar\u0131m\u0131zla payla\u015fmaya haz\u0131r\u0131z.\u201d<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada, ilk 15 y\u0131ll\u0131k s\u00fcre zarf\u0131nda sadece yat\u0131r\u0131m ve i\u015fletme giderlerinin hesap edildi\u011finin alt\u0131 \u00e7izildi. Mao Chun Yang, \u201cN\u00fckleer santralde her y\u0131l \u00fcretilecek 65 milyar kWh elektrik, bakanl\u0131\u011fa sunulan teklif mektubumuzda belirtilen ko\u015fullar \u00e7er\u00e7evesinde T\u00fcrkiye\u2019de geli\u015ftirilen benzer projelerden en az y\u00fczde 20 daha ucuza kullan\u0131ma sunulabilecek\u201d dedi.<\/p>\n<p><strong>\u00a0AKKUYU\u2019DAK\u0130 \u0130LK PROJEN\u0130N \u015eARTLARI NEYD\u0130?<\/strong><\/p>\n<p>* T\u00fcrkiye, Mersin Akkuyu\u2019daki ilk santral i\u00e7in 2010 y\u0131l\u0131nda Ruslarla anla\u015ft\u0131. 7 y\u0131l i\u00e7inde ilk \u00fcnite devreye girecek.<\/p>\n<p>* 22 milyar dolarl\u0131k anla\u015fmada Hazine garantisi yok, finansman\u0131 Ruslar \u00fcstlendi.<\/p>\n<p>* Projede devlet kurumu TETA\u015e 15 y\u0131l s\u00fcreyle y\u00fczde 50 al\u0131m garantisi veriyor. Kilovatsaati 12.35 cent fiyattan (KDV hari\u00e7) elektri\u011fi alacak.<\/p>\n<p>* 15 y\u0131l\u0131n sonunda, T\u00fcrk taraf\u0131 45 y\u0131l boyunca Ruslar\u0131n elde edece\u011fi kar\u0131n y\u00fczde 20\u2019sini alacak. (Bununla ilgili madde \u00c7in\u2019in teklifinde bulunmuyor.)<\/p>\n<p>* 4 reakt\u00f6r kurulacak ve 4.800 MW kurulu g\u00fc\u00e7 kapasitesi olacak.<\/p>\n<p>* Y\u0131ll\u0131k 40 milyar kWh elektrik \u00fcretilecek. (Y\u0131ll\u0131k 3.6 milyar dolar daha az gaz ithalat\u0131 anlam\u0131na geliyor)<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/nukleere-cin-teklifi!_3317.html#.UX4Xacq85QU\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Sinop\u2019a yap\u0131lacak n\u00fckleer santral i\u00e7in \u2018Japonya-Fransa\u2019 giri\u015fimiyle yar\u0131\u015fan \u00c7in, T\u00fcrkiye\u2019yle n\u00fckleer teknolojisini payla\u015fmay\u0131 teklif etti. Milliyet\u2019in haberine g\u00f6re \u00c7in taraf\u0131, \u201cBu ticari bir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[886,63,67,4933,71,21,88,846],"views":647,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10277"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10277"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10277\/revisions"}],"predecessor-version":[{"id":10280,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10277\/revisions\/10280"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10278"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}