{"id":10274,"date":"2013-04-29T09:37:55","date_gmt":"2013-04-29T06:37:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10274"},"modified":"2013-04-29T09:37:55","modified_gmt":"2013-04-29T06:37:55","slug":"soma-holding-yeni-celteke-405-mwlik-santral-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/soma-holding-yeni-celteke-405-mwlik-santral-kuracak\/","title":{"rendered":"(Turkish) Soma Holding Yeni \u00c7eltek`e 405 MW`lik Santral Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10274\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Soma Holding, Merzifon Yeni \u00c7eltek havzas\u0131nda 405 MW`lik k\u00f6m\u00fcre dayal\u0131 termik santrali kurmaya haz\u0131rlan\u0131yor. Grup, Zonguldak`ta ba\u015flatt\u0131\u011f\u0131 ta\u015fk\u00f6m\u00fcr\u00fc sahas\u0131 geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 2014 ortalar\u0131nda tamamlamay\u0131 planl\u0131yor.\u00a0<\/strong><\/p>\n<p>Soma Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Alp G\u00fcrkan, \u0130stanbul`da bir grup gazeteciyle bir araya geldi. Elektrik \u00fcretiminde do\u011falgaza ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n azalt\u0131lmas\u0131 hedefi do\u011frultusunda k\u00f6m\u00fcrle \u00e7al\u0131\u015fan santrallerin b\u00fcy\u00fck \u00f6nem ta\u015f\u0131d\u0131\u011f\u0131n\u0131 belirten G\u00fcrkan, Soma Holding olarak Merzifon Yeni \u00c7eltek`te k\u00f6m\u00fcre dayal\u0131 bir termik santral kurmaya haz\u0131rland\u0131klar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>30 y\u0131l s\u00fcreyle i\u015fletecekleri sahada y\u0131lda 1 milyon 250 bin tonluk \u00fcretim ve 1500 ki\u015filik istihdam hedeflediklerini onlatan G\u00fcrkan, kurulacak santralin b\u00f6lgedeki rezerve ba\u011fl\u0131 olarak 270 Megawatt veya 405 Megawatt g\u00fcc\u00fcnde olabilece\u011fini belirtti. G\u00fcrkan, yeni santralin, d\u00fcnyada en son geli\u015ftirilen ve temiz enerji \u00fcretimi sa\u011flayan Ak\u0131\u015fkan Yatak Teknolojisi`ne g\u00f6re kurulaca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p><strong>EN B\u00dcY\u00dcK YERALTI K\u00d6M\u00dcR \u00dcRET\u0130C\u0130S\u0130Y\u0130Z<\/strong><\/p>\n<p><em><\/em>Soma Holding`in 5.5 milyon ton \u00fcretimi ve 6 bine yak\u0131n \u00e7al\u0131\u015fan\u0131yla T\u00fcrkiye\u2019nin en b\u00fcy\u00fck yeralt\u0131 k\u00f6m\u00fcr \u00fcreticisi konumunda bulundu\u011funu belirten Alp G\u00fcrkan, Zonguldak\u2019ta da rezerv belirleme \u00e7al\u0131\u015fmalar\u0131n\u0131n devam etti\u011fini anlatt\u0131. Bu \u00e7al<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/Alp-Gurkan-Soma-Holding-YKB-HI-356676.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-10275\" title=\"Alp-Gurkan-Soma-Holding-YKB--HI-356676\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/Alp-Gurkan-Soma-Holding-YKB-HI-356676-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/Alp-Gurkan-Soma-Holding-YKB-HI-356676-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/Alp-Gurkan-Soma-Holding-YKB-HI-356676-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/Alp-Gurkan-Soma-Holding-YKB-HI-356676-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/Alp-Gurkan-Soma-Holding-YKB-HI-356676.jpg 547w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131\u015fmalar\u0131n tahminlerinden uzun s\u00fcrd\u00fc\u011f\u00fcn\u00fc anlatan G\u00fcrkan, bunun nedenini sahadaki rezervin, kendilerine ihale \u00f6ncesi verilen belgelerdeki rakamlar\u0131 tam yans\u0131tmamas\u0131ndan ileri geldi\u011fini vurgulad\u0131. Alp G\u00fcrkan, kamu ile vard\u0131klar\u0131 mutabakatla, t\u00fcm sahada rezerv ara\u015ft\u0131rmalar\u0131n\u0131 s\u0131f\u0131rdan yapt\u0131klar\u0131n\u0131 belirterek, bu \u00e7al\u0131\u015fmalar\u0131n 2014 y\u0131l\u0131n\u0131n Haziran ay\u0131nda bitirilmesinin planland\u0131\u011f\u0131n\u0131 kaydetti.<\/p>\n<p><strong>ZONGULDAK`TA MADENC\u0130L\u0130\u011eE YEN\u0130 D\u00dcZEN<\/strong><\/p>\n<p>Elde edilecek veriler \u0131\u015f\u0131\u011f\u0131nda Zonguldak`taki bu sahalarda k\u00f6m\u00fcr \u00fcretimi yap\u0131p yapmayacaklar\u0131na karar vereceklerini belirten G\u00fcrkan, kararlar\u0131n\u0131n olumsuz olmas\u0131 halinde, yapacaklar\u0131 30 milyon liral\u0131k ara\u015ft\u0131rma maliyetinin zarar hanesine yaz\u0131laca\u011f\u0131n\u0131 da vurgulad\u0131.<\/p>\n<p>Zonguldak`taki sahalarda \u00fcretime ge\u00e7ilmesi halinde b\u00f6lgede yeni bir \u00fcretim d\u00fczeni ve yap\u0131lanma kuracaklar\u0131n\u0131 ifade eden G\u00fcrkan, &#8220;\u015eu anda Zonguldak\u2019ta kullan\u0131lanlar eski teknolojiler. Bunlar\u0131n tamamen mekanize edilip ileri teknolojilerin kulland\u0131\u011f\u0131 i\u015fletmeler haline getirme arzumuz var&#8221; diye konu\u015ftu. Daha \u00f6nce kat\u0131ld\u0131klar\u0131 Tun\u00e7bilek ihalesinin iptal edildi\u011fini hat\u0131latan G\u00fcrkan, yak\u0131nda yeniden a\u00e7\u0131lacak ihaleye yine kat\u0131lacaklar\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/p>\n<p><strong>MADEN OCA\u011eINDA YA\u015eAM ODALARI<\/strong><\/p>\n<p>Alp G\u00fcrkan, maden i\u015fletmecili\u011fi konusunda engin bir tecr\u00fcbeleri oldu\u011funu, Soma B\u00f6lgesi`ndeki i\u015fletmelerinde bug\u00fcne kadar hi\u00e7 grizu patlamas\u0131 ya\u015fanmad\u0131\u011f\u0131n\u0131 anlatt\u0131. Soma\u2019daki madende patlama riski bulunan metan gaz\u0131n\u0131 s\u00fcrekli kontrol alt\u0131nda tuttuklar\u0131n\u0131 kaydeden Alp G\u00fcrkan, &#8220;Ayr\u0131ca herhangi bir kaza an\u0131nda 500 i\u015f\u00e7inin 20 g\u00fcn s\u00fcreyle yeralt\u0131nda yeme-i\u00e7me ihtiyac\u0131n\u0131 kar\u015f\u0131layacak, d\u0131\u015far\u0131yla oksijen ba\u011flant\u0131s\u0131n\u0131n kurulu \u2018Ya\u015fam Odalar\u0131\u2019 olu\u015fturduk\u201d dedi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/soma-holding-yeni-celteke-405-mwlik-santral-kuraca_3315.html#.UX4VY8q85QU\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Soma Holding, Merzifon Yeni \u00c7eltek havzas\u0131nda 405 MW`lik k\u00f6m\u00fcre dayal\u0131 termik santrali kurmaya haz\u0131rlan\u0131yor. Grup, Zonguldak`ta ba\u015flatt\u0131\u011f\u0131 ta\u015fk\u00f6m\u00fcr\u00fc sahas\u0131 geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 2014 ortalar\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10275,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[4931,4932,63,67,1675,4930,4929,438],"views":753,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10274"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10274"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10274\/revisions"}],"predecessor-version":[{"id":10276,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10274\/revisions\/10276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10275"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}