{"id":102729,"date":"2019-11-12T07:40:11","date_gmt":"2019-11-12T04:40:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=102729"},"modified":"2019-11-12T07:40:33","modified_gmt":"2019-11-12T04:40:33","slug":"yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor\/","title":{"rendered":"(Turkish) &#8217;Y\u00fczen Yeni G\u00fcne\u015f \u00c7iftli\u011fi&#8217; Yenilenebilirli\u011fin Kolayl\u0131\u011f\u0131n\u0131 G\u00f6zler \u00d6n\u00fcne Seriyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/102729\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Hollanda\u2019daki Sekdoorn y\u00fczen g\u00fcne\u015f enerjisi \u00e7iftli\u011fi, 6 haftal\u0131k bir \u00e7al\u0131\u015fmadan sonra tamamland\u0131. Bu, elektrik santrali in\u015fa etmek i\u00e7in Hollandal\u0131 orta\u011f\u0131 GroenLeven ile birlikte \u00e7al\u0131\u015fan, yenilenebilir enerji sekt\u00f6r\u00fcnde uzmanla\u015fm\u0131\u015f BayWa r.e. Alman firmas\u0131n\u0131n \u015fimdiye kadar ki en h\u0131zl\u0131 in\u015faat s\u00fcresi olarak ta kay\u0131tlara ge\u00e7mi\u015ftir.<\/h1>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-102732\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor.jpg\" alt=\"\" width=\"320\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor.jpg 960w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor-768x446.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor-500x291.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/yuzen-yeni-gunes-ciftligi-yenilenebilirligin-kolayligini-gozler-onune-seriyor-80x47.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>G\u00fcne\u015f enerjisi santrali<\/strong> y\u0131ll\u0131k 13.330 MWh enerji verimine sahip olacak ve y\u0131lda yakla\u015f\u0131k <strong>6.500 ton CO2 emisyonu<\/strong> sa\u011flayacak ve <strong>4.000 hanenin<\/strong> e\u015fde\u011fer enerji sa\u011flayacakt\u0131r. Y\u00fczen g\u00fcne\u015f enerjisi santralleri, ad\u0131ndan da anla\u015f\u0131laca\u011f\u0131 gibi,<strong> su k\u00fctlesi<\/strong> \u00fczerinde <strong>y\u00fczen bir yap\u0131 \u00fczerine monte edilmi\u015f<\/strong> g\u00fcne\u015f panelleridir. Bunun avantaj\u0131, arazi gereksinimlerini azaltmalar\u0131d\u0131r \u00e7\u00fcnk\u00fc <strong>end\u00fcstriyel havuzlara, i\u00e7me suyu rezervuarlar\u0131na ve k\u00fc\u00e7\u00fck g\u00f6llere<\/strong> monte edilebilirler.<\/p>\n<p><strong>D\u00fcnya Bankas\u0131<\/strong>\u2019na g\u00f6re, Avrupa\u2019daki insan yap\u0131m\u0131 tatl\u0131 su rezervlerinin <strong>%10<\/strong>\u2019u, <strong>y\u00fczer paneller<\/strong> monte edildi\u011finde <strong>200 GWp\u2019nin<\/strong> \u00fczerinde \u00fcretim potansiyeline sahiptir. <strong>Sekdoorn projesi<\/strong>, Fransa\u2019daki <strong>O\u2019MEGA1 projesi<\/strong>&#8216;nin ard\u0131ndan <strong>Hollanda<\/strong>\u2019daki en b\u00fcy\u00fck <strong>y\u00fczen g\u00fcne\u015f enerjisi tesisi<\/strong> ve bug\u00fcne kadar Avrupa\u2019n\u0131n en b\u00fcy\u00fck <strong>2&#8217;inci<\/strong> projesidir.<\/p>\n<p><strong>Kaynak:<\/strong>\u00a0<a href=\"https:\/\/www.forbes.com\/sites\/emanuelabarbiroglio\/2019\/11\/07\/a-new-floating-solar-farm-shows-that-renewables-can-be-easy\/#32b89b527930\" target=\"_blank\" rel=\"noopener\">Forbes<\/a>\u00a0&#8211; <strong>Haz\u0131rlayan:<\/strong> <a href=\"https:\/\/www.dunyaenerji.org.tr\/yuzen-yeni-gunes-santrali-yenilenebilirlerin-kolay-olabilecegini-gosteriyor\/\" target=\"_blank\" rel=\"noopener\">D\u00fcnya Enerji Konseyi \/ T\u00fcrk Milli Komitesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Hollanda\u2019daki Sekdoorn y\u00fczen g\u00fcne\u015f enerjisi \u00e7iftli\u011fi, 6 haftal\u0131k bir \u00e7al\u0131\u015fmadan sonra tamamland\u0131. Bu, elektrik santrali in\u015fa etmek i\u00e7in Hollandal\u0131 orta\u011f\u0131 GroenLeven ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":102732,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[60756,59291,6966,53114,60753,60757,52259,35038,60754,35039,53157,39384,1287,60761,60760,60755,60758,57242,60752,17929,60762,60759,60763],"views":554,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/102729"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=102729"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/102729\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/102732"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=102729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=102729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=102729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}