{"id":10252,"date":"2013-04-28T00:39:28","date_gmt":"2013-04-27T21:39:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10252"},"modified":"2013-04-28T00:39:49","modified_gmt":"2013-04-27T21:39:49","slug":"izdemir-enerji-santrali-icin-acele-kamulastirma","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izdemir-enerji-santrali-icin-acele-kamulastirma\/","title":{"rendered":"(Turkish) \u0130zdemir Enerji Santrali \u0130\u00e7in Acele Kamula\u015ft\u0131rma"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10252\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130zmir`in Alia\u011fa ve Fo\u00e7a il\u00e7elerinde kurulacak \u0130zdemir Enerji Elektrik Santrali`nin in\u015fas\u0131 i\u00e7in gereken baz\u0131 ta\u015f\u0131nmazlar acele kamula\u015ft\u0131r\u0131lacak. <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/izdemir-enerji-santrali-HI-467342.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10253\" title=\"izdemir-enerji-santrali--HI-467342\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/izdemir-enerji-santrali-HI-467342-300x197.jpg\" alt=\"\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/izdemir-enerji-santrali-HI-467342-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/izdemir-enerji-santrali-HI-467342-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/izdemir-enerji-santrali-HI-467342.jpg 343w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>\u0130zmir \u0130li, Fo\u00e7a ve Alia\u011fa \u0130l\u00e7elerinde tesis edilecek \u0130zdemir Enerji Elektrik (Termik-Konvansiyonel) \u00dcretim Tesisinin yap\u0131m\u0131 amac\u0131yla ihtiya\u00e7 duyulan baz\u0131 ta\u015f\u0131nmazlar\u0131n acele kamula\u015ft\u0131r\u0131lmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131. Hazine ad\u0131na tescil edilmek \u00fczere yap\u0131lacak kamula\u015ft\u0131rma i\u015flemlerini Enerji Piyasas\u0131 D\u00fczenleme Kurumu y\u00fcr\u00fctecek.<\/p>\n<p><strong>S\u00dcPERKR\u0130T\u0130K YAKMA TEKNOLOJ\u0130L\u0130 SANTRAL<\/strong><\/p>\n<p>\u0130zdemir Enerji Elektrik Santrali 350 milyon dolarl\u0131k yat\u0131r\u0131mla kurulacak. \u0130zmir Demir \u00c7elik Anonim \u015eirketi`nin fabrika sahas\u0131 i\u00e7indeki 103 d\u00f6n\u00fcm arazi \u00fczerine kurulacak 350 MWe g\u00fcc\u00fcndeki santral, ithal k\u00f6m\u00fcre dayal\u0131 s\u00fcperkritik yakma teknolojisine sahip olmak \u00fczere projelendirildi. Santralin yap\u0131m s\u00f6zle\u015fme anla\u015fmas\u0131 <strong>Nisan 2011<\/strong> tarihinde imzalanm\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/izdemir-enerji-santrali-icin-acele-kamulastirma_3302.html#.UXxGBcq85QU\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130zmir`in Alia\u011fa ve Fo\u00e7a il\u00e7elerinde kurulacak \u0130zdemir Enerji Elektrik Santrali`nin in\u015fas\u0131 i\u00e7in gereken baz\u0131 ta\u015f\u0131nmazlar acele kamula\u015ft\u0131r\u0131lacak. \u0130zmir \u0130li, Fo\u00e7a ve Alia\u011fa \u0130l\u00e7elerinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10253,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[4917,63,67,750,4916,4915,2689,4918],"views":1021,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10252"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10252"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10252\/revisions"}],"predecessor-version":[{"id":10256,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10252\/revisions\/10256"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10253"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}