{"id":10238,"date":"2013-04-28T00:11:39","date_gmt":"2013-04-27T21:11:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10238"},"modified":"2013-04-28T00:11:39","modified_gmt":"2013-04-27T21:11:39","slug":"malatyaya-cop-gazindan-elektrik-uretim-tesisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/malatyaya-cop-gazindan-elektrik-uretim-tesisi\/","title":{"rendered":"(Turkish) Malatya\u2019ya \u00c7\u00f6p Gaz\u0131ndan Elektrik \u00dcretim Tesisi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10238\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div>\n<p><strong>Malatya\u2019da toplanan \u00e7\u00f6pten elektrik enerjisi \u00fcretilmesi amac\u0131yla kat\u0131 at\u0131k bertaraf tesisi in\u015fa edilecek. 28 Nisan\u2019da Enerji ve Tabi Kaynaklar Bakan\u0131 Ta<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/cop-metan-gazi-elektrik-uretimi-enerji-505x280.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10239\" title=\"cop-metan-gazi-elektrik-uretimi-enerji-505x280\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/cop-metan-gazi-elektrik-uretimi-enerji-505x280-300x166.jpg\" alt=\"\" width=\"300\" height=\"166\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/cop-metan-gazi-elektrik-uretimi-enerji-505x280-300x166.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/cop-metan-gazi-elektrik-uretimi-enerji-505x280-500x277.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/cop-metan-gazi-elektrik-uretimi-enerji-505x280-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/cop-metan-gazi-elektrik-uretimi-enerji-505x280.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ner Y\u0131ld\u0131z\u2019\u0131n kat\u0131l\u0131m\u0131yla temeli at\u0131lacak tesis, tamamland\u0131\u011f\u0131nda 4 bin 500 abonenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/strong><\/p>\n<p>Malatya Belediyesi kat\u0131 at\u0131k sahas\u0131nda in\u015fa edilecek tesis i\u00e7in 28 Nisan Pazar g\u00fcn\u00fc temel atma t\u00f6reni d\u00fczenlenecek.<\/p>\n<p>\u00c7\u00f6plerin toplanmas\u0131 nedeniyle ortaya \u00e7\u0131kan gazlar\u0131n do\u011faya sal\u0131n\u0131m\u0131n\u0131n \u00f6nleyerek elektrik enerjisi \u00fcreteceklerini s\u00f6yleyen Belediye Ba\u015fkan\u0131 Ahmet \u00c7ak\u0131r, \u201cMevcut \u00e7\u00f6p saham\u0131zda rehabilitasyon \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda d\u00fczenlemeler yap\u0131lacak ve alan a\u011fa\u00e7 dikilebilecek hale getirilecek. D\u0131\u015far\u0131ya \u00e7\u0131kmakta olan zararl\u0131 gazlar da \u00f6nlenerek enerji \u00fcretiminde kullan\u0131lacak. Yakla\u015f\u0131k 4 bin 500 abonenin ayl\u0131k elektrik t\u00fcketimi kar\u015f\u0131lanabilecek. Tesis, 10-16 y\u0131l kadar hizmet verebilecek.\u201d dedi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/04\/27\/malatyaya-cop-gazindan-elektrik-uretim-tesisi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Malatya\u2019da toplanan \u00e7\u00f6pten elektrik enerjisi \u00fcretilmesi amac\u0131yla kat\u0131 at\u0131k bertaraf tesisi in\u015fa edilecek. 28 Nisan\u2019da Enerji ve Tabi Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z\u2019\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10239,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[1901,4905,19,63,67,18,3489,4906,2489],"views":1014,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10238"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10238"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10238\/revisions"}],"predecessor-version":[{"id":10241,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10238\/revisions\/10241"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10239"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}