{"id":102253,"date":"2019-11-05T10:47:36","date_gmt":"2019-11-05T07:47:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=102253"},"modified":"2019-11-05T10:48:40","modified_gmt":"2019-11-05T07:48:40","slug":"sidney-yonetiminden-ruzgar-ve-gunes-enerjisine-60-milyon-dolarlik-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sidney-yonetiminden-ruzgar-ve-gunes-enerjisine-60-milyon-dolarlik-yatirim\/","title":{"rendered":"(Turkish) Sidney Y\u00f6netimi&#8217;nden R\u00fczgar ve G\u00fcne\u015f Enerjisine 60 Milyon Dolarl\u0131k Yat\u0131r\u0131m"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/102253\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Sidney y\u00f6netimi taraf\u0131ndan belediyeye ait olan t\u00fcm binalar\u0131n enerjisinin tamam\u0131n\u0131n yenilenebilir enerjiden kar\u015f\u0131lanmas\u0131na y\u00f6nelik harekete ge\u00e7ilirken 1 Ocak 2020 tarihi itibari ile t\u00fcm kamusal <img loading=\"lazy\" class=\"alignright wp-image-102256\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/sidney-yonetiminden-ruzgar-ve-gunes-enerjisine-60-milyon-dolarlik-yatirim.jpg\" alt=\"\" width=\"320\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/sidney-yonetiminden-ruzgar-ve-gunes-enerjisine-60-milyon-dolarlik-yatirim.jpg 441w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/sidney-yonetiminden-ruzgar-ve-gunes-enerjisine-60-milyon-dolarlik-yatirim-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/sidney-yonetiminden-ruzgar-ve-gunes-enerjisine-60-milyon-dolarlik-yatirim-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>alanlar\u0131n ihtiya\u00e7 duydu\u011fu enerjinin %75 r\u00fczgar ve %25&#8217;i ise g\u00fcne\u015ften sa\u011flanmas\u0131 planlanmaktad\u0131r.<\/strong><\/h1>\n<p>Ayr\u0131ca, 270 MW <strong>Sapphire R\u00fczgar \u00c7iftli\u011fi<\/strong>\u00a0ve\u00a0120 MW <strong>Bomen G\u00fcne\u015f \u00c7iftli\u011fi<\/strong>\u2019nden\u00a0<strong>elektrik sat\u0131n al\u0131m\u0131na y\u00f6nelik<\/strong> taahh\u00fct veren konsey b\u00f6ylece\u00a0<strong>8000 evin enerji t\u00fcketimine<\/strong> denk gelen enerji t\u00fcketiminin kar\u015f\u0131layaca\u011f\u0131 ve <strong>yakla\u015f\u0131k 20.000 tonluk <\/strong>karbon emisyon sal\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ilece\u011fi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Y\u00f6netim ayr\u0131ca,<strong>\u00a0karbon vergisi<\/strong>ni de hayata ge\u00e7irerek\u00a0<strong>fosil yak\u0131t end\u00fcstrilerindeki<\/strong> istihdam\u0131 azaltmak i\u00e7inde ad\u0131mlar atmay\u0131 planlamaktad\u0131r.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.canberratimes.com.au\/story\/6451269\/sydney-mayor-unveils-60m-renewables-plan\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\" data-abc=\"true\">The Canberra Times<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sidney y\u00f6netimi taraf\u0131ndan belediyeye ait olan t\u00fcm binalar\u0131n enerjisinin tamam\u0131n\u0131n yenilenebilir enerjiden kar\u015f\u0131lanmas\u0131na y\u00f6nelik harekete ge\u00e7ilirken 1 Ocak 2020 tarihi itibari ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":102256,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[53114,5070,34818,52674,52259,41955,26559,60232,35038,24809,53157,60233,11427,35002,2511,53282,60234,37032,34977,793,26829],"views":269,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/102253"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=102253"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/102253\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/102256"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=102253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=102253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=102253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}