{"id":102158,"date":"2019-11-03T12:37:58","date_gmt":"2019-11-03T09:37:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=102158"},"modified":"2019-11-03T12:38:28","modified_gmt":"2019-11-03T09:38:28","slug":"turkiyenin-10-yillik-elektrik-uretimi-kapasitesi-planlama-bilgilendirmesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-10-yillik-elektrik-uretimi-kapasitesi-planlama-bilgilendirmesi\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin 10 Y\u0131ll\u0131k &#8216;Elektrik \u00dcretimi Kapasitesi Planlama&#8217; Bilgilendirmesi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/102158\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>TE\u0130A\u015e&#8217;\u0131n yay\u0131mlad\u0131\u011f\u0131 5 ve 10 y\u0131ll\u0131k (2024-2029) B\u00f6lgesel Ba\u011flanabilir Kapasite Raporu\u2019nda yer alan veriler \u0131\u015f\u0131\u011f\u0131nda, 2024 y\u0131l\u0131 sonuna kadar 20.818 MW, 2029 y\u0131l\u0131 sonuna kadar ise 6.453 MW olmak \u00fczere toplamda 15 iletim b\u00f6lgesinin 9\u2019unda 27.271 MW b\u00f6lgesel kapasite sa\u011flanacakt\u0131r.<\/strong><\/h1>\n<p><strong>B\u00f6lgesel kapasitelerin<\/strong> olmad\u0131\u011f\u0131\u00a0<strong>58 b\u00f6lge ilinde<\/strong> ise ku\u0308c\u0327u\u0308k u\u0308retim yat\u0131r\u0131mlar\u0131, <strong>OSB bu\u0308nyelerindeki<\/strong> u\u0308retim tesisleri, <strong>cu\u0308zi miktarda kapasite<\/strong> art\u0131s\u0327lar\u0131 gibi baz\u0131 olas\u0131 <strong>u\u0308retim yat\u0131r\u0131mlara<\/strong> <img loading=\"lazy\" class=\"alignright wp-image-102161\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/turkiyenin-10-yillik-elektrik-uretimi-kapasitesi-planlamasini-teias-acikladi.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/turkiyenin-10-yillik-elektrik-uretimi-kapasitesi-planlamasini-teias-acikladi.jpg 750w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/turkiyenin-10-yillik-elektrik-uretimi-kapasitesi-planlamasini-teias-acikladi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/turkiyenin-10-yillik-elektrik-uretimi-kapasitesi-planlamasini-teias-acikladi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/11\/turkiyenin-10-yillik-elektrik-uretimi-kapasitesi-planlamasini-teias-acikladi-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>y\u00f6nelik\u00a0<strong>2019-2024 y\u0131llar\u0131<\/strong>na y\u00f6nelik il bazl\u0131 olarak <strong>50\u2019s\u0327er MW<\/strong> olmak \u00fczere toplamda <strong>2.900 MW\u2019l\u0131k<\/strong> kapasite sa\u011flanabilecek. Bununla birlikte\u00a0<strong>\u00e7at\u0131 tipi GES yat\u0131r\u0131mlar\u0131 ba\u015fvurular\u0131<\/strong> ise raporda belirtilen\u00a0<strong>kapasitelerin d\u0131\u015f\u0131nda<\/strong> yer alacakt\u0131r.<\/p>\n<p>T\u00fcrkiye elektrik \u00fcretim kapasitesi i\u00e7in kurulu g\u00fc\u00e7 tahmini <strong>2024 y\u0131l\u0131<\/strong> i\u00e7in <strong>111.710 MW<\/strong>, <strong>2029 y\u0131l\u0131<\/strong> i\u00e7in ise <strong>127.754 MW<\/strong> olarak belirlenirken T\u00fcrkiye\u2019nin elektrik \u00fcretim kapasitesi ge\u00e7en ay sonu ise\u00a0<strong>90.420,9 MW\u2019a<\/strong> seviyesine \u00e7\u0131km\u0131\u015ft\u0131r.<\/p>\n<p><strong>5 ve 10 Y\u0131ll\u0131k (2024-2029) B\u00f6lgesel Ba\u011flanabilir Kapasite Raporu \u0130\u00e7in:\u00a0<\/strong><a href=\"https:\/\/www.teias.gov.tr\/sites\/default\/files\/2019-07\/5_ve_10_Yillik_%282024-2029%29_Bolgesel_Baglanabilir_Kapasite_Raporu_0.pdf\" target=\"_blank\" rel=\"noopener\">https:\/\/www.teias.gov.tr\/sites\/default\/files\/2019-07\/5_ve_10_Yillik_%282024-2029%29_Bolgesel_Baglanabilir_Kapasite_Raporu_0.pdf<\/a> adresini ziyaret edebilirsiniz.<\/p>\n<p>Sarp ALTINEL \/ Enerji Gazetesi &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. TE\u0130A\u015e&#8217;\u0131n yay\u0131mlad\u0131\u011f\u0131 5 ve 10 y\u0131ll\u0131k (2024-2029) B\u00f6lgesel Ba\u011flanabilir Kapasite Raporu\u2019nda yer alan veriler \u0131\u015f\u0131\u011f\u0131nda, 2024 y\u0131l\u0131 sonuna kadar 20.818 MW, 2029 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":102161,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[54351,60112,53114,5070,60110,45275,52674,4996,60111,60114,60113,21919,52259,53157,60108,60109,30503,54431,846],"views":367,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/102158"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=102158"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/102158\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/102161"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=102158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=102158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=102158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}