{"id":101896,"date":"2019-10-30T10:59:18","date_gmt":"2019-10-30T07:59:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=101896"},"modified":"2019-10-30T11:00:56","modified_gmt":"2019-10-30T08:00:56","slug":"rwe-polonyada-1500-mw-kapasiteye-sahip-4-ruzgar-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rwe-polonyada-1500-mw-kapasiteye-sahip-4-ruzgar-santrali-kuracak\/","title":{"rendered":"(Turkish) &#8217;RWE&#8217; Polonya&#8217;da 1500 MW Kapasiteye Sahip 4 R\u00fczgar Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/101896\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Alman RWE Renewables GmbH taraf\u0131ndan Polonya&#8217;da 1500 MW&#8217;l\u0131k kapasiteyi a\u015fan 4 <img loading=\"lazy\" class=\"alignright wp-image-101899\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/rwe-polonyada-1500-mw-kapasiteye-sahip-4-ruzgar-santrali-kuracak.jpg\" alt=\"\" width=\"320\" height=\"208\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/rwe-polonyada-1500-mw-kapasiteye-sahip-4-ruzgar-santrali-kuracak.jpg 751w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/rwe-polonyada-1500-mw-kapasiteye-sahip-4-ruzgar-santrali-kuracak-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/rwe-polonyada-1500-mw-kapasiteye-sahip-4-ruzgar-santrali-kuracak-500x325.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/rwe-polonyada-1500-mw-kapasiteye-sahip-4-ruzgar-santrali-kuracak-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>adet y\u00fczen r\u00fczgar enerjisi santrali (RES) kurulmas\u0131 planlan\u0131yor.<\/h1>\n<p>Almanya&#8217;n\u0131n \u00f6nde gelen <strong>enerji gruplar\u0131ndan<\/strong>\u00a0<strong>&#8216;RWE AG&#8217;<\/strong>, yenilenebilir enerji departman\u0131 <strong>RWE Renewables GmbH&#8217;\u0131n<\/strong> 1.5 GW&#8217;l\u0131k kapasiteden \u00e7ok daha fazla potansiyele sahip Polonya&#8217;da yer alan <strong>deniz\u00fcst\u00fc (offshore) r\u00fczgar enerjisi santrali projelerini<\/strong> sat\u0131n ald\u0131\u011f\u0131n\u0131 duyurdu.<\/p>\n<p>Buna g\u00f6re, <strong>Balt\u0131k Denizi<\/strong>&#8216;nin <strong>Polonya karasular\u0131n\u0131n<\/strong> orta kesiminde yer alan <strong>Slupsk Bank<\/strong> alan\u0131n\u0131n \u00e7evresine al\u0131nan bu projelere <strong>4<\/strong> adet <strong>r\u00fczgar enerjisi santrali<\/strong> kurulumu ger\u00e7ekle\u015ftirecek.<\/p>\n<p>Sarp ALTINEL \/ Enerji Gazetesi &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Alman RWE Renewables GmbH taraf\u0131ndan Polonya&#8217;da 1500 MW&#8217;l\u0131k kapasiteyi a\u015fan 4 adet y\u00fczen r\u00fczgar enerjisi santrali (RES) kurulmas\u0131 planlan\u0131yor. Almanya&#8217;n\u0131n \u00f6nde gelen [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":101899,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[59716,25446,59809,21919,52259,9906,59808,59810,35002,35004,53282,37078,59807,30503,59811,56304],"views":443,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/101896"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=101896"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/101896\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/101899"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=101896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=101896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=101896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}