{"id":101372,"date":"2019-10-21T15:15:17","date_gmt":"2019-10-21T12:15:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=101372"},"modified":"2019-10-21T15:15:30","modified_gmt":"2019-10-21T12:15:30","slug":"equinor-norvec-te-88-mw-guce-sahip-yuzer-ruzgar-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/equinor-norvec-te-88-mw-guce-sahip-yuzer-ruzgar-santrali-kuracak\/","title":{"rendered":"(Turkish) &#8217;Equinor&#8217; Norve\u00e7&#8217;te 88 MW G\u00fcce Sahip Y\u00fczer R\u00fczgar Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/101372\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Norve\u00e7 merkezli enerji \u015firketi Equinor <img loading=\"lazy\" class=\"alignright wp-image-101374\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/equinor-norvec-te-88-mw-guce-sahip-yuzer-ruzgar-santrali-kuracak.jpg\" alt=\"\" width=\"320\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/equinor-norvec-te-88-mw-guce-sahip-yuzer-ruzgar-santrali-kuracak.jpg 569w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/equinor-norvec-te-88-mw-guce-sahip-yuzer-ruzgar-santrali-kuracak-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/equinor-norvec-te-88-mw-guce-sahip-yuzer-ruzgar-santrali-kuracak-500x290.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/equinor-norvec-te-88-mw-guce-sahip-yuzer-ruzgar-santrali-kuracak-80x46.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>taraf\u0131ndan Norve\u00e7&#8217;te 88 mw kapasiteye sahip y\u00fczen r\u00fczgar santraline y\u00f6nelik 550 milyon euro yat\u0131r\u0131m yap\u0131lacak.<\/strong><\/h1>\n<p>Kuzey Denizi&#8217;nde y\u00fczen t\u00fcrbinler kurulmas\u0131n\u0131 sa\u011flayacak olan proje i\u00e7in 5 milyar Norve\u00e7 Kronu (550 milyon euro) yat\u0131r\u0131m ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>Toplam da kapasitenin <strong>88 mw<\/strong> olaca\u011f\u0131 <strong>Hywin Tampen R\u00fczg\u00e2r Enerji Santrali<\/strong>, 11 r\u00fczgar t\u00fcrbininden meydana gelecek olup\u00a0<strong>Gullfaks ve Snorre b\u00f6lgelerinin<\/strong> elektrik ihtiyac\u0131n\u0131n <strong>% 35&#8217;ini<\/strong> kar\u015f\u0131layacak.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.renewableenergyworld.com\/2019\/10\/11\/88-mw-floating-offshore-wind-farm-to-power-offshore-oil-rigs-in-norway\/#gref\" target=\"_blank\" rel=\"noopener\">Renewable Energy World <\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Norve\u00e7 merkezli enerji \u015firketi Equinor taraf\u0131ndan Norve\u00e7&#8217;te 88 mw kapasiteye sahip y\u00fczen r\u00fczgar santraline y\u00f6nelik 550 milyon euro yat\u0131r\u0131m yap\u0131lacak. Kuzey Denizi&#8217;nde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":101374,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[49494,52674,19,52259,18,38597,59135,59134,59132,35002,53282,58568,59133],"views":451,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/101372"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=101372"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/101372\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/101374"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=101372"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=101372"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=101372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}