{"id":101359,"date":"2019-10-21T12:50:06","date_gmt":"2019-10-21T09:50:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=101359"},"modified":"2019-10-21T12:50:06","modified_gmt":"2019-10-21T09:50:06","slug":"kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak\/","title":{"rendered":"(Turkish) K\u00fcresel G\u00fcne\u015f Sekt\u00f6r\u00fc 89,5 GW&#8217;l\u0131k \u0130lave Kapasite \u0130le Yeniden Canlanacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/101359\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>K\u00fcresel g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde ge\u00e7ti\u011fimiz y\u0131l ya\u015fanan duraksamadan sonra, yeniden canlanma ya\u015fanacak. G\u00fcne\u015f <img loading=\"lazy\" class=\"alignright wp-image-101361\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak.jpg 868w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/kuresel-gunes-sektoru-895-gwlik-ilave-kapasite-ile-yeniden-canlanacak-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>enerjisinde 2025 y\u0131l\u0131na kadar 89.5 gw&#8217;l\u0131k ilave kapasite devreye al\u0131nacak olup g\u00fcne\u015f enerjisinde ge\u00e7ti\u011fimiz y\u0131l ya\u015fanan yava\u015flama sonras\u0131 yat\u0131r\u0131mlar yeniden h\u0131z kazanacak.<\/strong><\/h1>\n<p>K\u00fcresel g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn kurulu g\u00fcc\u00fc <strong>2025<\/strong> y\u0131l\u0131nda <strong>128,5 GW<\/strong>&#8216;a \u00e7\u0131karken g\u00fcne\u015f enerjisinde b\u00fcy\u00fcmeyi bir\u00e7ok fakt\u00f6r tetikleyecek. Al\u0131m garantisi temelli modelden <strong>te\u015fviksiz bir modele ge\u00e7ilmesi<\/strong> kapasite art\u0131\u015f\u0131n\u0131 etkileyecek olup sekt\u00f6rdeki oyuncular\u0131n operasyonlar\u0131nda verimlili\u011fi \u00f6nceleyen<strong> ak\u0131ll\u0131 uygulamalar\u0131 kullanmas\u0131<\/strong> da sekt\u00f6rdeki b\u00fcy\u00fcmeye katk\u0131 sa\u011flayacakt\u0131r. Di\u011fer yandan ise\u00a0<strong>batarya teknolojileriyle<\/strong> entegre <strong>g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131<\/strong> da yayg\u0131nla\u015facak.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.smart-energy.com\/renewable-energy\/solar-photovoltaics-recovery-to-add-89-5gw-sector-worth-44-82-billion-by-2025\/\" target=\"_blank\" rel=\"noopener\">Smart Energy International<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. K\u00fcresel g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde ge\u00e7ti\u011fimiz y\u0131l ya\u015fanan duraksamadan sonra, yeniden canlanma ya\u015fanacak. G\u00fcne\u015f enerjisinde 2025 y\u0131l\u0131na kadar 89.5 gw&#8217;l\u0131k ilave kapasite devreye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":101361,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[59115,19805,59117,24799,59119,52259,53157,5982,59120,59116,59114,59113,59118],"views":234,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/101359"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=101359"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/101359\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/101361"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=101359"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=101359"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=101359"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}