{"id":100912,"date":"2019-10-14T16:02:50","date_gmt":"2019-10-14T13:02:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=100912"},"modified":"2019-10-14T16:05:11","modified_gmt":"2019-10-14T13:05:11","slug":"donmez-yekdem-calismalari-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/donmez-yekdem-calismalari-devam-ediyor\/","title":{"rendered":"(Turkish) D\u00f6nmez: &#8220;YEKDEM \u00c7al\u0131\u015fmalar\u0131 Devam Ediyor&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/100912\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrkiye&#8217;nin Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalelerinin d\u00fczenleme ve \u00e7al\u0131\u015fmalar\u0131n\u0131n s\u00fcrd\u00fc\u011f\u00fcn\u00fc dile getiren D\u00f6nmez taraf\u0131ndan &#8220;Mini YEKA projeleri i\u00e7in \u00f6n\u00fcm\u00fczdeki haftalarda ilana \u00e7\u0131kar\u0131z. 2020&#8217;nin ilk \u00e7eyre\u011finde de ihaleleri yapm\u0131\u015f oluruz.&#8221; denildi.<\/strong><\/h1>\n<p>D\u00f6nmez, \u00e7at\u0131 tipi g\u00fcne\u015f enerjisi santrallerinin kurulumunda art\u0131\u015f olabilece\u011fini de dile getirerek &#8220;Bu projelerde art\u0131k geri d\u00f6n\u00fc\u015f s\u00fcreleri <strong>10 y\u0131l\u0131n alt\u0131na<\/strong> d\u00fc\u015ft\u00fc. Buna uygun <strong>i\u015f ve finansman<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-100914\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/donmez-yekdem-calismalari-devam-ediyor.jpg\" alt=\"\" width=\"320\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/donmez-yekdem-calismalari-devam-ediyor.jpg 693w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/donmez-yekdem-calismalari-devam-ediyor-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/donmez-yekdem-calismalari-devam-ediyor-500x352.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/donmez-yekdem-calismalari-devam-ediyor-71x50.jpg 71w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/p>\n<p><strong>modellerinin<\/strong> de birlikte geli\u015febilece\u011fini d\u00fc\u015f\u00fcn\u00fcyorum. Bankalarla da g\u00f6r\u00fc\u015f\u00fcyoruz. Burada b\u00fcy\u00fck bir f\u0131rsat var.&#8221; dedi.<\/p>\n<p>D\u00f6nmez, T\u00fcrkiye&#8217;nin do\u011falgazda arz g\u00fcvenli\u011finde yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalara ili\u015fkin, <strong>Tuz G\u00f6l\u00fc Do\u011fal Gaz Depolama tesisi<\/strong>nin kapasitesinin <strong>5,5 milyar metrek\u00fcpe<\/strong> kadar \u00e7\u0131kaca\u011f\u0131n\u0131 vurgularken <strong>Silivri<\/strong>&#8216;deki 2,8 milyar metrek\u00fcp kapasiteli yer alt\u0131 depolama tesisinde kapasite art\u0131\u015f ihalesinin bug\u00fcnlerde yenilenece\u011fini dile getirerek, &#8220;B\u00f6ylece, bu tesisin kapasitesi de <strong>yakla\u015f\u0131k 4,6 milyar metrek\u00fcpe<\/strong> gelmi\u015f olacak. Bununla birlikte <strong>BOTA\u015e<\/strong>, <strong>yer alt\u0131 depo kapasitesi<\/strong> olarak \u00f6n\u00fcm\u00fczdeki <strong>4-5 y\u0131l<\/strong> i\u00e7inde <strong>10 milyar metrek\u00fcpe<\/strong> ula\u015fm\u0131\u015f olacak.&#8221; ifadelerine yer verdi.<\/p>\n<p>Ayr\u0131ca D\u00f6nmez, s\u0131v\u0131la\u015ft\u0131r\u0131lm\u0131\u015f do\u011fal gaz (LNG) pay\u0131n\u0131n hem d\u00fcnyada hem de T\u00fcrkiye&#8217;de giderek artt\u0131\u011f\u0131n\u0131 an\u0131msatarak T\u00fcrkiye&#8217;nin bulundu\u011fu konum itibar\u0131yla avantajl\u0131 oldu\u011funu belirten D\u00f6nmez, <span style=\"text-decoration: underline;\">s\u00f6zlerine \u015f\u00f6yle devam etti;<\/span><\/p>\n<p>&#8220;Biz de bu avantaj\u0131 t\u00fcketicilerimizin lehine kullanmak i\u00e7in de\u011ferlendirmi\u015f olduk. \u0130ki tane y\u00fczer LNG depolama ve yeniden gazla\u015ft\u0131rma terminali ekledik ve sisteme boru gaz\u0131 d\u0131\u015f\u0131nda LNG giri\u015f kapasitesini art\u0131rd\u0131k. B\u00f6yle bak\u0131ld\u0131\u011f\u0131nda, T\u00fcrkiye&#8217;nin y\u0131ll\u0131k olarak neredeyse <strong>30 milyar metrek\u00fcpl\u00fck<\/strong> LNG&#8217;yi gazla\u015ft\u0131rma kapasitesi yakalad\u0131\u011f\u0131n\u0131 teknik olarak g\u00f6rd\u00fck. Bunun yakla\u015f\u0131k \u00fc\u00e7te birini kullan\u0131yoruz. Bir taraftan da y\u0131ll\u0131k gaz t\u00fcketimimizin <strong>50 milyar metrek\u00fcp<\/strong> oldu\u011funu dikkate ald\u0131\u011f\u0131m\u0131zda, bu yat\u0131r\u0131mlarla t\u00fcketimin yar\u0131s\u0131n\u0131 art\u0131k LNG yoluyla alabilir hale gelmi\u015fiz. T\u00fcrkiye&#8217;yi tamamen boru gaz\u0131na ba\u011f\u0131ml\u0131l\u0131ktan kurtarm\u0131\u015f olduk. Ge\u00e7mi\u015f y\u0131llarda <strong>% 80-90<\/strong> seviyesinde olan <strong>boru gaz\u0131 ba\u011f\u0131ml\u0131l\u0131\u011f\u0131m\u0131z\u0131<\/strong>, teknik olarak <strong>% 50 seviyesine<\/strong> d\u00fc\u015f\u00fcrd\u00fck.&#8221;<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.enerji.gov.tr\/tr-TR\/Bakanlik-Haberleri\/Guneydoguda-petrol-Trakyada-gaz-bulundu\" target=\"_blank\" rel=\"noopener\">ETKB<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye&#8217;nin Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalelerinin d\u00fczenleme ve \u00e7al\u0131\u015fmalar\u0131n\u0131n s\u00fcrd\u00fc\u011f\u00fcn\u00fc dile getiren D\u00f6nmez taraf\u0131ndan &#8220;Mini YEKA projeleri i\u00e7in \u00f6n\u00fcm\u00fczdeki haftalarda ilana [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":100914,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,49],"tags":[531,58678,58680,42733,58681,54036,52259,53157,58679,58682,53787,58675,53369,54682,58674,58677,58676],"views":607,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100912"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=100912"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100912\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/100914"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=100912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=100912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=100912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}