{"id":100773,"date":"2019-10-12T10:23:27","date_gmt":"2019-10-12T07:23:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=100773"},"modified":"2019-10-12T10:23:27","modified_gmt":"2019-10-12T07:23:27","slug":"ebrdden-kiyikoy-rese-yonelik-37-milyon-dolarlik-kredi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ebrdden-kiyikoy-rese-yonelik-37-milyon-dolarlik-kredi\/","title":{"rendered":"(Turkish) EBRD&#8217;den &#8216;K\u0131y\u0131k\u00f6y RES&#8217;e Y\u00f6nelik 37 Milyon Dolarl\u0131k Kredi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/100773\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD) taraf\u0131ndan K\u0131y\u0131k\u00f6y R\u00fczgar Santrali&#8217;nin kapasitesinin 28 MW&#8217;den 100 MW&#8217;ye \u00e7\u0131kar\u0131lmas\u0131 projesine y\u00f6nelik 37 milyon <img loading=\"lazy\" class=\"alignright wp-image-100775\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/ebrd-den-kiyikoy-rese-yonelik-37-milyon-dolarlik-kredi.jpg\" alt=\"\" width=\"320\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/ebrd-den-kiyikoy-rese-yonelik-37-milyon-dolarlik-kredi.jpg 654w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/ebrd-den-kiyikoy-rese-yonelik-37-milyon-dolarlik-kredi-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/ebrd-den-kiyikoy-rese-yonelik-37-milyon-dolarlik-kredi-500x291.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/ebrd-den-kiyikoy-rese-yonelik-37-milyon-dolarlik-kredi-80x46.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>dolar kredi sa\u011flanacak.<\/strong><\/h1>\n<p>Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD), <strong>Borusan EnBW Enerji Yat\u0131r\u0131m ve \u00dcretim A.\u015e.<\/strong>&#8216;nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan Alenka Enerji&#8217;ye K\u0131y\u0131k\u00f6y R\u00fczgar Santrali&#8217;nin\u00a0 kapasitesinin <strong>28 MW<\/strong>&#8216;den <strong>100 MW<\/strong>&#8216;ye \u00e7\u0131kar\u0131lmas\u0131 projesine y\u00f6nelik\u00a0<strong>37 milyon dolar kredi<\/strong> sa\u011flayacak.<\/p>\n<p>Sa\u011flanacak bu kredi, K\u0131y\u0131k\u00f6y R\u00fczgar Santrali&#8217;nin ilk \u00f6nce kurulumu s\u0131ras\u0131nda <strong>\u0130\u015f Leasing<\/strong> taraf\u0131ndan verilen <strong>10,3 milyon euro leasing<\/strong> kolayl\u0131\u011f\u0131n\u0131n <strong>yeniden finansman\u0131n\u0131 da<\/strong> i\u00e7eriyor. Finansman sa\u011flanacak projenin toplam tutar\u0131 ise <strong>101 milyon dolar<\/strong>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD) taraf\u0131ndan K\u0131y\u0131k\u00f6y R\u00fczgar Santrali&#8217;nin kapasitesinin 28 MW&#8217;den 100 MW&#8217;ye \u00e7\u0131kar\u0131lmas\u0131 projesine y\u00f6nelik 37 milyon dolar kredi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":100775,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[58503,44699,58502,19,52259,18,4808,58500,58504,58505,35002,35004,58501,34977,26829],"views":705,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100773"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=100773"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100773\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/100775"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=100773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=100773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=100773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}