{"id":100621,"date":"2019-10-10T12:27:53","date_gmt":"2019-10-10T09:27:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=100621"},"modified":"2019-10-10T12:27:53","modified_gmt":"2019-10-10T09:27:53","slug":"almanya-karasal-res-kurulumlarini-artirma-planini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/almanya-karasal-res-kurulumlarini-artirma-planini-tamamladi\/","title":{"rendered":"(Turkish) Almanya, &#8216;Karasal RES Kurulumlar\u0131&#8217;n\u0131 Art\u0131rma Plan\u0131n\u0131 Tamamlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/100621\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Almanya, karada r\u00fczgar enerji santralleri kurulumunu yeniden canland\u0131rmay\u0131 <img loading=\"lazy\" class=\"alignright wp-image-100624\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/alman-ya-karasal-res-kurulumlarini-artirma-planini-tamamladi.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/alman-ya-karasal-res-kurulumlarini-artirma-planini-tamamladi.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/alman-ya-karasal-res-kurulumlarini-artirma-planini-tamamladi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/alman-ya-karasal-res-kurulumlarini-artirma-planini-tamamladi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/alman-ya-karasal-res-kurulumlarini-artirma-planini-tamamladi-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ama\u00e7layan bir plan haz\u0131rlad\u0131.<\/strong><\/h1>\n<p>Almanya Ekonomi Bakanl\u0131\u011f\u0131, karada r\u00fczgar t\u00fcrbinleri kurulumunu\u00a0 yeniden canland\u0131rmay\u0131 ama\u00e7layan bir plan haz\u0131rlad\u0131. Haz\u0131rlanan plan, r\u00fczgar t\u00fcrbinleri kurulumunda b\u00fcrokrasiyi ve vatanda\u015flar\u0131n muhalefetlerini azaltmay\u0131 hedefliyor.<\/p>\n<p>Planda yer alan\u00a0<span style=\"text-decoration: underline;\">18 ad\u0131m<\/span> <strong>2019<\/strong> ve <strong>2020<\/strong> y\u0131l\u0131 i\u00e7inde at\u0131lacak. Almanya&#8217;da karada r\u00fczgar santrali kurulumu 2019&#8217;un ilk yar\u0131s\u0131nda <strong>% 82 azal\u0131\u015f<\/strong> g\u00f6stererek 287 mw seviyesine gerilemi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Almanya, karada r\u00fczgar enerji santralleri kurulumunu yeniden canland\u0131rmay\u0131 ama\u00e7layan bir plan haz\u0131rlad\u0131. Almanya Ekonomi Bakanl\u0131\u011f\u0131, karada r\u00fczgar t\u00fcrbinleri kurulumunu\u00a0 yeniden canland\u0131rmay\u0131 ama\u00e7layan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":100624,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[929,20504,19,52259,18,58334,35002,35004,53282,23130,58333,29918],"views":515,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100621"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=100621"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100621\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/100624"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=100621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=100621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=100621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}