{"id":100395,"date":"2019-10-07T11:12:31","date_gmt":"2019-10-07T08:12:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=100395"},"modified":"2019-10-07T11:28:24","modified_gmt":"2019-10-07T08:28:24","slug":"2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi\/","title":{"rendered":"(Turkish) Maspo&#8217;nun 2&#8217;inci Faz Jeotermal Yat\u0131r\u0131m\u0131 &#8216;ALA-2&#8217; Elektrik Sat\u0131\u015f\u0131na Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/100395\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>&#8216;Maspo Enerji&#8217; 2&#8217;inci Faz Yat\u0131r\u0131m\u0131nda da Elektrik Sat\u0131\u015f\u0131na Ba\u015flad\u0131<\/h1>\n<h2><strong>MASPO Enerji A.\u015e.\u2019nin Manisa Ala\u015fehir\u2019de T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ilk 10 jeotermal santrali aras\u0131nda yerini alan 30 MW g\u00fcc\u00fcndeki ALA-2 jeotermal enerji santralinin T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan ge\u00e7ici kabul\u00fc yap\u0131larak i\u015fletmeye al\u0131nd\u0131. <\/strong><\/h2>\n<p>G\u00dcRMEN Group \u015firketlerinden Maspo Enerji\u2019nin Manisa Ala\u015fehir\u2019de kurulu jeotermal enerji santral <img loading=\"lazy\" class=\"alignright size-medium wp-image-100398\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi-1-298x300.jpg\" alt=\"\" width=\"298\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi-1-298x300.jpg 298w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi-1-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi-1-398x400.jpg 398w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi-1-50x50.jpg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi-1-100x100.jpg 100w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/2inci-faz-jeotermal-enerji-yatirimi-ala-2-elektrik-satisina-basladi-1.jpg 485w\" sizes=\"(max-width: 298px) 100vw, 298px\" \/>yat\u0131r\u0131mlar\u0131ndan 30 MW kurulu g\u00fcce sahip yeni faz\u0131 ALA-2\u2019nin T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan ge\u00e7ici kabul\u00fc yap\u0131ld\u0131. Ge\u00e7ici kabul ile birlikte Maspo Enerji, Ekim ay\u0131 itibar\u0131yla jeotermal enerjide ikinci faz yat\u0131r\u0131m\u0131 ALA-2 jeotermal enerji santralinden de elektrik sat\u0131\u015f\u0131na ba\u015flad\u0131.<\/p>\n<p>Maspo Enerji A.\u015e. Genel M\u00fcd\u00fcr\u00fc Murat Solmaz, 2017 y\u0131l\u0131nda jeotermal santral yat\u0131r\u0131mlar\u0131n\u0131n ilk faz\u0131 olarak 10 MW kurulu g\u00fcc\u00fc olan jeotermal enerji santrali ALA-1\u2019i i\u015fletmeye ald\u0131klar\u0131n\u0131 ve 30 MW\u2019l\u0131k ALA-2 jeotermal enerji santralinin yat\u0131r\u0131m s\u00fcrecini ba\u015flatt\u0131klar\u0131n\u0131 a\u00e7\u0131klayarak, \u201cBu tip yat\u0131r\u0131mlar i\u00e7in k\u0131sa denebilecek bir s\u00fcrede, T\u00fcrk m\u00fchendisli\u011finin ba\u015far\u0131s\u0131, teknolojik anlamda da geldi\u011fi nokta ad\u0131na \u00f6nemli bir \u00f6rnek olan ALA-2\u2019yi de tamamlad\u0131k. Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan 30 MW g\u00fcc\u00fcndeki ALA-2 santralimizin ge\u00e7ici kabul yap\u0131ld\u0131. Toplam kurulu g\u00fcc\u00fcm\u00fcz ALA-2\u2019nin i\u015fletmeye al\u0131nmas\u0131yla 40 MW\u2019a ula\u015ft\u0131. T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ilk <strong>10 jeotermal santrali<\/strong> aras\u0131nda yer almam\u0131z\u0131n gururunu ve heyecan\u0131n\u0131 ya\u015f\u0131yoruz\u201d dedi.<\/p>\n<h2><strong>\u201cYeni yat\u0131r\u0131m fizibiliteleri s\u00fcr\u00fcyor\u201d<\/strong><\/h2>\n<p>Yenilenebilir enerji yat\u0131r\u0131mlar\u0131n\u0131n hayata ge\u00e7irilmesinde \u00f6ncelikle jeotermali stratejik bir alan olarak se\u00e7tiklerini belirten Murat Solmaz, \u201cMaspo Enerji \u015fu anda 12 bin 650 hektarl\u0131k jeotermal sahas\u0131 ile T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ve verimli alanlar\u0131nda fizibilite \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor\u201d dedi.<\/p>\n<p>Yeni yat\u0131r\u0131m hedefleri ile ilgili olarak da a\u00e7\u0131klama yapan Maspo Enerji A.\u015e. Genel M\u00fcd\u00fcr\u00fc Murat Solmaz, \u201cJeotermal; yenilebilir, verimli, \u00e7evre dostu ve yerli bir kaynak olmas\u0131n\u0131n yan\u0131 s\u0131ra T\u00fcrkiye\u2019nin en zengin kaynaklara sahip oldu\u011fu enerji alanlar\u0131ndan biri. \u015eirketimizin yat\u0131r\u0131m yapt\u0131\u011f\u0131 sahan\u0131n da b\u00fcy\u00fck bir potansiyeli ve kapasitesi var. T\u00fcrkiye\u2019nin en verimli ve de\u011ferli bu sahas\u0131nda yeni yat\u0131r\u0131m alternatiflerini de\u011ferlendiriyor; santral yat\u0131r\u0131mlar\u0131m\u0131z\u0131n \u00fc\u00e7\u00fcnc\u00fc faz\u0131 i\u00e7in fizibilite \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131 s\u00fcrd\u00fcr\u00fcyoruz\u201d de\u011ferlendirmesinde bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. &#8216;Maspo Enerji&#8217; 2&#8217;inci Faz Yat\u0131r\u0131m\u0131nda da Elektrik Sat\u0131\u015f\u0131na Ba\u015flad\u0131 MASPO Enerji A.\u015e.\u2019nin Manisa Ala\u015fehir\u2019de T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ilk 10 jeotermal santrali aras\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":100397,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[963,52259,58160,39562,36848,58161,58159,36184,25284,58157,58158,39590,34977,26829],"views":951,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100395"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=100395"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100395\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/100397"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=100395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=100395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=100395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}