{"id":100298,"date":"2019-10-05T21:50:48","date_gmt":"2019-10-05T18:50:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=100298"},"modified":"2019-10-05T21:54:06","modified_gmt":"2019-10-05T18:54:06","slug":"guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi\/","title":{"rendered":"(Turkish) G\u00fcney Amerika\u2019n\u0131n &#8216;En B\u00fcy\u00fck G\u00fcne\u015f Santrali&#8217; Hizmete Girdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/100298\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Arjantin\u2019de \u00c7in sermayesi ve teknolojisi kullan\u0131larak kurulumu yap\u0131lan &#8216;Cauchari G\u00fcne\u015f Park\u0131&#8217;n\u0131n resmi a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131ld\u0131. G\u00fcney Amerika\u2019n\u0131n en b\u00fcy\u00fck &#8216;G\u00fcne\u015f Santrali&#8217; olan projeyle 160 bin hanenin elektrik ihtiyac\u0131 kar\u015f\u0131lanacakt\u0131r.<\/strong><\/h1>\n<p><strong>4000 metre<\/strong> y\u00fckseklikte yer alan\u00a0<strong>da\u011f\u0131n tepesinde<\/strong> yerle\u015fik <strong>g\u00fcne\u015f enerji santrali<\/strong> kom\u015fu \u00fclkeler <strong>\u015eili<\/strong> ve <strong>Bolivya<\/strong> s\u0131n\u0131r\u0131nda bulunan <strong>Jujuy<\/strong> eyaletinin <strong>Cauchari<\/strong> kentinde kuruldu. <strong>% 85<\/strong> oran\u0131nda <strong>Export-Import Bank of China<\/strong>\u2019n\u0131n finanse etti\u011fi <strong>390 milyon dolar<\/strong> tutar\u0131ndaki <strong>ges projesi<\/strong>, <img loading=\"lazy\" class=\"alignright wp-image-100304\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi.jpg 732w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/10\/guney-amerika-nin-en-buyuk-gunes-enerjisi-santrali-hizmete-girdi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>Shanghai Electric Power Construction<\/strong> adl\u0131 \u00c7in \u015firketi taraf\u0131ndan yap\u0131l\u0131rken <strong>santralin finansman\u0131n\u0131n<\/strong> <strong>% 15<\/strong>\u2019i ise <strong>yerel y\u00f6netim<\/strong> taraf\u0131ndan sa\u011fland\u0131.<\/p>\n<p>A\u00e7\u0131l\u0131\u015f t\u00f6reninde yapt\u0131\u011f\u0131 konu\u015fmada Arjantin Ba\u015fkan\u0131 <strong>Mauricio Macri, <\/strong>g\u00fcne\u015f enerjisi tesisiyle bunun sadece bir ba\u015flang\u0131\u00e7 oldu\u011fu \u00e7\u00fcnk\u00fc Jujuy\u2019un g\u00fcne\u015f enerjisi \u00fcretme kapasitesinin s\u0131n\u0131rs\u0131z oldu\u011funa vurgu yap\u0131ld\u0131. Ayr\u0131ca\u00a0Macri,\u00a0<strong>Cauchari G\u00fcne\u015f Park\u0131n\u0131n<\/strong>\u00a0<strong>b\u00f6lgeden ve yerli halktan<\/strong> toplamda\u00a0<strong>1.200 ki\u015fiye istihdam<\/strong> olana\u011f\u0131 da sa\u011flayaca\u011f\u0131n\u0131 belirtti.<\/p>\n<p><strong>G\u00fcney Amerika<\/strong>\u2019da t\u00fcr\u00fcn\u00fcn en b\u00fcy\u00fc\u011f\u00fc konumundaki\u00a0<strong>Cauchari g\u00fcne\u015f tesisi<\/strong> her biri <strong>100 mw<\/strong> enerji \u00fcretme kapasitesine sahip <strong>3 tesisten<\/strong> meydana gelmektedir.\u00a0<strong>800 hektar<\/strong> alan \u00fczerine kurulan g\u00fcne\u015f santralinde\u00a0<strong>1.18 milyon g\u00fcne\u015f paneli<\/strong> yer almaktad\u0131r. Santralin\u00a0<strong>karbondioksit emisyonunun<\/strong> ise en az <strong>325 bin tona kadar<\/strong> geriletece\u011fi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Sarp ALTINEL \/ Enerji Gazetesi &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Arjantin\u2019de \u00c7in sermayesi ve teknolojisi kullan\u0131larak kurulumu yap\u0131lan &#8216;Cauchari G\u00fcne\u015f Park\u0131&#8217;n\u0131n resmi a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131ld\u0131. G\u00fcney Amerika\u2019n\u0131n en b\u00fcy\u00fck &#8216;G\u00fcne\u015f Santrali&#8217; olan projeyle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":100304,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[8898,12393,58088,886,58091,49494,19,21919,52259,18,58089,53563,53157,33011,30503,58090,11260],"views":702,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100298"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=100298"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/100298\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/100304"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=100298"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=100298"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=100298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}