<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>hybrid power plant &#8211; 7/24 Energy Sector Market Agenda with Energy News | Enerji Gazetesi</title>
	<atom:link href="https://www.enerjigazetesi.ist/en/enerji-piyasas%C4%B1/hybrid-power-plant/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.enerjigazetesi.ist/en</link>
	<description>&#34; Energy for Life is Born From Istanbul . . .&#34;</description>
	<lastBuildDate>Sun, 08 Aug 2021 10:57:31 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.8.13</generator>

<image>
	<url>https://www.enerjigazetesi.ist/wp-content/uploads/2019/09/logo-49x50.png</url>
	<title>hybrid power plant &#8211; 7/24 Energy Sector Market Agenda with Energy News | Enerji Gazetesi</title>
	<link>https://www.enerjigazetesi.ist/en</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>&#8216;Asagi Kaleköy HEPP&#8217; Transformed into Hybrid with Solar Power Plant</title>
		<link>https://www.enerjigazetesi.ist/en/asagi-kalekoy-hes-gunes-santrali-yatirimi-ile-hibrite-donustu/</link>
					<comments>https://www.enerjigazetesi.ist/en/asagi-kalekoy-hes-gunes-santrali-yatirimi-ile-hibrite-donustu/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 08 Aug 2021 10:48:18 +0000</pubDate>
				<category><![CDATA[ELECTRICITY ENERGY NEWS]]></category>
		<category><![CDATA[ENERGY AGENDA NEWS]]></category>
		<category><![CDATA[SOLAR ENERGY NEWS]]></category>
		<category><![CDATA[HYDROELECTRIC POWER PLANT NEWS]]></category>
		<category><![CDATA[Aşağı Kaleköy Barajı ve hidroelektrik santrali (HES)]]></category>
		<category><![CDATA[Aşağı Kaleköy Dam and hydroelectric power plant (HEPP)]]></category>
		<category><![CDATA[Aşağı Kaleköy HEPP]]></category>
		<category><![CDATA[Aşağı Kaleköy HES]]></category>
		<category><![CDATA[Cengiz Holding haberleri]]></category>
		<category><![CDATA[Cengiz Holding news]]></category>
		<category><![CDATA[clean and renewable energy news]]></category>
		<category><![CDATA[güneş enerjisi santrali yatırımı]]></category>
		<category><![CDATA[HEPP news]]></category>
		<category><![CDATA[hes haberleri]]></category>
		<category><![CDATA[hibrit enerji santrali]]></category>
		<category><![CDATA[hibrit enerji santrali haberleri]]></category>
		<category><![CDATA[hidroelektrik santrali (hes) haberleri]]></category>
		<category><![CDATA[hybrid power plant]]></category>
		<category><![CDATA[hybrid power plant news]]></category>
		<category><![CDATA[hydroelectric power plant (HEPP) news]]></category>
		<category><![CDATA[Kaleköy HEPP news]]></category>
		<category><![CDATA[Kaleköy HES haberleri]]></category>
		<category><![CDATA[solar power plant investment]]></category>
		<category><![CDATA[temiz ve yenilenebilir enerji haberleri]]></category>
		<guid isPermaLink="false">https://www.enerjigazetesi.ist/?p=139917</guid>

					<description><![CDATA[<a href="https://www.enerjigazetesi.ist/en/asagi-kalekoy-hes-gunes-santrali-yatirimi-ile-hibrite-donustu/"><img width="300" height="200" src="https://www.enerjigazetesi.ist/wp-content/uploads/2021/08/asagi-kalekoy-hes-gunes-ile-hibrit-santrale-donustu-300x200.jpg" alt="&#8216;Asagi Kaleköy HEPP&#8217; Transformed into Hybrid with Solar Power Plant" align="right" style="margin: 0 0 20px 20px;max-width:100%" /></a><p><strong>The Lower Kaleköy Dam and hydroelectric power plant (HES) in Bingöl, with an installed power of 510 MW, turned into a hybrid with the investment of a solar power plant.</strong></p>
<p>Cengiz Holding Energy Group President Ahmet Cengiz stated that the power plant has the title of the first hybrid power plant in Turkey and the second largest in the world with the GES installed on the Aşağı Kaleköy HEPP site, while with the additional 80 mW GES power plant project consisting of 200 thousand solar panels.</p>
<p><a href="https://www.enerjigazetesi.ist/en/asagi-kalekoy-hes-gunes-santrali-yatirimi-ile-hibrite-donustu/" rel="nofollow">&#8216;Asagi Kaleköy HEPP&#8217; Transformed into Hybrid with Solar Power Plant | Devamı&gt;&gt;&gt;</a></p>
]]></description>
		
					<wfw:commentRss>https://www.enerjigazetesi.ist/en/asagi-kalekoy-hes-gunes-santrali-yatirimi-ile-hibrite-donustu/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Turkey&#8217;s First Hybrid Power Plant Established by Cengiz Holding</title>
		<link>https://www.enerjigazetesi.ist/en/turkiye-nin-ilk-hibrit-enerji-santrali-cengiz-holding-tarafindan-kuruldu/</link>
					<comments>https://www.enerjigazetesi.ist/en/turkiye-nin-ilk-hibrit-enerji-santrali-cengiz-holding-tarafindan-kuruldu/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 27 Jul 2021 08:56:47 +0000</pubDate>
				<category><![CDATA[ELECTRICITY ENERGY NEWS]]></category>
		<category><![CDATA[ENERGY AGENDA NEWS]]></category>
		<category><![CDATA[SOLAR ENERGY NEWS]]></category>
		<category><![CDATA[HYDROELECTRIC POWER PLANT NEWS]]></category>
		<category><![CDATA[Aşağı Kaleköy Barajı ve hidroelektrik santrali]]></category>
		<category><![CDATA[Bingöl'den haberler]]></category>
		<category><![CDATA[Cengiz Holding haberleri]]></category>
		<category><![CDATA[Cengiz Holding news]]></category>
		<category><![CDATA[clean and renewable energy news]]></category>
		<category><![CDATA[energy sector news]]></category>
		<category><![CDATA[enerji sektörü piyasası haberleri]]></category>
		<category><![CDATA[Güneş Enerji Santrali haberleri]]></category>
		<category><![CDATA[hibrit enerji santrali]]></category>
		<category><![CDATA[hidroelektrik santrali (hes) haberleri]]></category>
		<category><![CDATA[hybrid power plant]]></category>
		<category><![CDATA[hydroelectric power plant (HEPP) news]]></category>
		<category><![CDATA[Lower Kaleköy Dam and hydroelectric power plant]]></category>
		<category><![CDATA[news from Bingöl]]></category>
		<category><![CDATA[solar power plant news]]></category>
		<category><![CDATA[temiz ve yenilenebilir enerji haberleri]]></category>
		<guid isPermaLink="false">https://www.enerjigazetesi.ist/?p=139175</guid>

					<description><![CDATA[<a href="https://www.enerjigazetesi.ist/en/turkiye-nin-ilk-hibrit-enerji-santrali-cengiz-holding-tarafindan-kuruldu/"><img width="300" height="200" src="https://www.enerjigazetesi.ist/wp-content/uploads/2021/07/turkiye-nin-ilk-hibrit-enerji-santrali-cengiz-holding-tarafindan-kuruldu-2-300x200.jpg" alt="Turkey&#8217;s First Hybrid Power Plant Established by Cengiz Holding" align="right" style="margin: 0 0 20px 20px;max-width:100%" /></a><p><strong>Cengiz Holding has installed a solar power plant consisting of 200,000 panels in the tailwater area of ​​the Lower Kaleköy Dam and hydroelectric power plant on the Murat River in Bingöl. The installed power of Turkey&#8217;s first and largest hybrid power plant, the world&#8217;s second largest, has reached 590 megawatts.</strong></p>
<p>July 27, 2021 – Cengiz Holding, which has signed giant projects in Turkey, has added an 80-megawatt solar power plant (GES) to its Aşağı Kaleköy Dam and hydroelectric power plant (HES) project, which started electricity production in Bingöl last year and has an installed capacity of 510 megawatts.</p>
<p><a href="https://www.enerjigazetesi.ist/en/turkiye-nin-ilk-hibrit-enerji-santrali-cengiz-holding-tarafindan-kuruldu/" rel="nofollow">Turkey&#8217;s First Hybrid Power Plant Established by Cengiz Holding | Devamı&gt;&gt;&gt;</a></p>
]]></description>
		
					<wfw:commentRss>https://www.enerjigazetesi.ist/en/turkiye-nin-ilk-hibrit-enerji-santrali-cengiz-holding-tarafindan-kuruldu/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
