Productivity Enhancing Project (VAP) 1st Term Applications Started!

2019 Year Productivity Improvement Project for Industrial Enterprises (VAP) Applications for First Term between January 1 – 31, 2019 and 1st – 31st July 2019.

For More Information>> Authorized: Umut ÖZBİLGİN – Gsm / Whatsup: 0532 336 20 55 – Mail: h.umut@ozbilgin.orgWeb: www.ozbilgin.org

In Industrial Enterprises; The projects prepared for the implementation of the measures determined by the energy survey work and the recovery of the energy saving potential are expressed as Efficiency Increasing Project (VAP). VAP is prepared for the implementation of the necessary measures to eliminate energy wastes, losses and inefficiencies in industrial enterprises.

Efficiency Enhancer Project supports envisage the support of projects for the energy efficiency of enterprises. Industrial enterprises that want to support the Productivity Enhancing Projects, submit their projects prepared by the Directorate General to the energy efficiency consultancy companies in accordance with the principles and procedures published by the General Directorate.

Businesses operating in the production of all kinds of goods, which are connected to the chamber of commerce and industry, chamber of commerce or industry, with a total annual energy consumption of 1000 TEP and above, can benefit from VAP supports.

Industrial Enterprises to Benefit from Productivity Enhancing Project (VAP) Supports:

1- The industrial enterprise is registered in the database of the Ministry of Energy (ENVER PORTAL),

2- The presence of energy manager,

3- To be informed about the energy consumption and energy management practices to the General Directorate of Renewable Energy (YEGM),

4- Having the ISO 50001 Energy Management System-User Manual and Terms Standard certificate or started to work on this issue,

Any industrial enterprise with annual energy consumption above 1000 TEP and fulfilling the above conditions can apply to benefit from grants with the VAP FILE prepared by an Energy Efficiency Consultant Company authorized by YEGM.

Applications can be made with maximum 5 projects at the same time. Projects with a maximum investment amount of 1 million TL are supported by 30%. With a simple account, there are 5 million TL worth of grants for 5 energy efficiency projects.

RESPONSIBILITIES FOR EVD COMPANIES FOR EFFICIENCY DEVELOPMENT PROJECT (VAP) INCENTIVES:

– Measurement of the VAP file,
– Preparation of feasibility study,
– Processing of all documents sent by the facility to the VAP file,
– Sending the final form of the file to YEMC to deliver the facility,
– Repeating the measurements by participating in the current situation meeting held by YEGM after acceptance of the application,
– Participation in a YEGM visit to determine the savings after the project entitles the grant,

RESPONSIBILITIES FOR INDUSTRIAL ENTERPRISES FOR THE PRODUCTION OF VAP

– Providing VAP application requirements,
– Preparation of the VAP application dossier to an EVD Company authorized in the industry,
– Determining the investment scope to be made by the facility and collecting offers from the suppliers for the said investment,
– Clearly fill the VAP business form,
– Preparation of documents to be added to the VAP file,
– Completion of the project file to YEMC.

In the projects submitted for the support to the General Directorate, if the service is taken from the company which is the expert of the sub-sector where the industrial enterprise operates, the service fee is included in the scope of the support within the framework of the principles and procedures published by the General Directorate as notification.

In case of application of VAP, the efficiency increase should be checked in the VAP application file as described in the post-application control section. However, the VAP projects adopted by YEGM after the application can be inspected and start the process of receiving incentives.

Productivity Enhancing Project VAP Applications;

For More Information>> Authorized: Umut ÖZBİLGİN – Gsm / Whatsup: 0532 336 20 55 – Mail: h.umut@ozbilgin.orgWeb: www.ozbilgin.org

To get detailed information and price quotation, you can also send us a message along with your contact details.

Fill out the Contact Form We’ll call you!

[contact-form-7 404 "Not Found"]
2020 Verimlilik Artırıcı Proje (VAP) Destek Başvurularıefficiency increasing projectefficiency increasing project preparation in industrial enterprises (vap)efficient energy useEndüstriyel İşletmendüstriyel işletmeler vap projesi hazırlatmaEndüstriyel İşletmelerde (VAP) Verimlilik Artırıcı Proje Başvuruenergy agendaenergy efficiencyenergy efficiency newsenergy newsEnerji Bakanlığı veri tabanıenerji gündemienerji haberlerienerji verimliliğienerji verimliliği haberleriEnerji Verimliliği ve Çevre Dairesi Başkanlığıenver portalıgranthibeISO 50001 Enerji Yönetim Sistemiproductivity increasing project applicationproject applicationvapvap applicationVAP başvurularıvap başvurusuvap destek başvurularıVAP DOSYASIvap hazırlamavap hazırlanmasıverimli enerji kullanımıverimlilik artırıcı projeVerimlilik Artırıcı Proje (VAP) haberleriVerimlilik Artırıcı Proje (VAP) TEŞVİKLERİverimlilik artırıcı proje başvurusuVerimlilik Artırıcı Proje Destek BaşvurularıVerimlilik Artırıcı Proje destekleriverimlilik artırıcı proje hazırlamaverimlilik artırıcı proje hazırlatmaVerimlilik Artırıcı Proje VAP Başvurularıverimlilik artırıcı proje yapan firmalar
Yorumlar (0)
Yorum Ekle